Integrating Digital Twin and BIM for Special-Length-Based Rebar Layout Optimization in Reinforced Concrete Construction
PDF
CiteCite
Copy URL
https://www.proquest.com/scholarly-journals/integrating-digital-twin-bim-special-length-based/docview/3239021596/se-2?accountid=208611
PrintAll OptionsReferences (35)
- 1.
Clash context representation and change component prediction based on graph convolutional network in MEP disciplines
Hu, Y; Xia, C; Chen, J; Gao, X. Adv. Eng. Inf Vol. 55, .- Times cited 4 on ProQuest
- 2.
Options for and challenges of employing digital twins in construction management
Salem, T; Dragomir, M. Appl. Sci Vol. 12, Iss. 6, .- Times cited 2 on ProQuest
- 3.
A BIM-data mining integrated digital twin frame- work for advanced project management
Y Pan; L Zhang. Autom Constr Vol. 124, (2021).- Times cited 8 on ProQuest
- 4.
Towards a semantic construction digital twin: directions for future research
Boje, C; Guerriero, A; Kubicki, S; Rezgui, Y. Automation in Construction Vol. 114, Iss. No. 103179, (2020).- Times cited 23 on ProQuest
- 5.
Automated optimization of steel reinforcement in RC building frames using building information modeling and hybrid genetic algorithm
Mangal, M; Cheng, J. Autom Constr Vol. 90, .- Times cited 5 on ProQuest
- 6.
Application of BIM to rebar modeling of a variable section column
Li, S; Shi, Y; Hu, J; Li, S; Li, H; Chen, A. Buildings Vol. 13, .- Times cited 3 on ProQuest
- 7.
Reducing rebar cutting waste and rebar usage of beams: a two-stage optimization algorithm
Widjaja, D; Kim, S. Buildings Vol. 13, .- Times cited 4 on ProQuest
- 8.
Digital twins for construction assets using BIM standard specifications
Nour El-Din, M; Pereira, P; Pocas Martins, J; Ramos, N. Buildings Vol. 12, Iss. 12, .- Times cited 7 on ProQuest
- 9.
Construction with digital twin information systems
Sacks, R; Brilakis, I; Pikas, E; Xie, H; Girolami, M. Data-Cent. Eng Vol. 1, .- Times cited 31 on ProQuest
- 10.
Digital twins in the construction industry: a perspective of practitioners and building authority
Ammar, A; Nassereddine, H; AbdulBaky, N; AbouKansour, A; Tannoury, J; Urban, H; Schranz, C. Front. Built Environ Vol. 8, .- Times cited 9 on ProQuest
- 11.
Digital twin: vision, benefits, boundaries, and creation for buildings
Khajavi, S; Motlagh, N; Jaribion, A; Werner, L; Holmström, J. IEEE Access Vol. 7, .- Times cited 39 on ProQuest
- 12.
Digital twins for construction sites: concepts, LoD definition, and applications
Zhang, J; Cheng, J; Chen, W; Chen, K. J. Manag. Eng Vol. 38, .- Times cited 11 on ProQuest
- 16.
Improved Building Information Modeling Based Method for Prioritizing Clash Detection in the Building Construction Design Phase
I. Bitaraf; A. Salimpour; P. Elmi; A.A. Shirzadi Javid. Buildings Vol. 14, (2024).- Times cited 2 on ProQuest
- 17.
Optimization of lap splice positions for near-zero rebar cutting waste in diaphragm walls using special-length-priority algorithms
Rachmawati, Titi Sari Nurul; Khant, Lwun Poe; Lim, Jeeyoung; Lee, Jeongsun; Kim, Sunkuk. Journal of Asian Architecture and Building Engineering; Taylor and Francis Ltd Vol. 23, Iss. 6, (2024): 1933-1950.- Times cited 2 on ProQuest
- 20.
Optimization of Rebar Usage and Sustainability Based on Special-Length Priority: A Case Study of Mechanical Couplers in Diaphragm Walls
D.D. Widjaja; L.P. Khant; S. Kim; K.-Y. Kim. Sustainability Vol. 16, (2024).- Times cited 2 on ProQuest