Costs of Queens Road Repair Projects Reduced Through Utilizing Reclaimed Material: Process Established by Late W. P. Dunn, Engineer at Flushing Plant, Converts Waste Asphalt Into New Surface for Reconditioning of the Highways and Easing the Paths of Motorists
New York Herald Tribune (1926-1962); New York, N.Y.. 23 Sep 1934: A14.
You might have access to the full article...
Try and log in through your library or institution to see if they have access to the full text.
