Abstract

In this paper, we study a project scheduling problem that is called resource constrained project scheduling problem under minimization of total weighted resource tardiness penalty cost (RCPSP-TWRTPC). In this problem, the project is subject to renewable resources, each renewable resource is available for limited time periods during the project life cycle, and keeping the resource for each extra period results in some tardiness penalty cost. We introduce a branch and bound algorithm to solve the problem exactly and use several bounding, fathoming, and dominance rules in our algorithm to shorten the enumeration process. We point out parameters affecting the RCPSP-TWRTPC degree of difficulty, generate extensive sets of sample instances for the problem, and perform comprehensive experimental analysis using the customized algorithm and also CPLEX solver. We analyze the algorithm behavior with respect to the changes in instances degree of difficulty and compare its performance for different cases with the CPLEX solver. The results reveal algorithm efficiency.

Details

Title
Resource Tardiness Weighted Cost Minimization in Project Scheduling
Author
Chaleshtari, Ali Shirzadeh
Publication year
2017
Publication date
2017
Publisher
John Wiley & Sons, Inc.
ISSN
16879147
e-ISSN
16879155
Source type
Scholarly Journal
Language of publication
English
ProQuest document ID
1860825624
Copyright
Copyright © 2017 Ali Shirzadeh Chaleshtari. This is an open access article distributed under the Creative Commons Attribution License, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.