Full Text

Turn on search term navigation

© 2017. This work is licensed under http://creativecommons.org/licenses/by/3.0/ (the “License”). Notwithstanding the ProQuest Terms and Conditions, you may use this content in accordance with the terms of the License.

Abstract

This study evaluated the effectiveness of two bioswales eight years after construction in Davis, California. The treatment bioswale measured 9 m × 1 m × 1 m (L × W × D). Engineered soil mix (75% native lava rock and 25% loam soil) replaced the native loam soil. Four Red Tip Photinia (Photinia × fraseri Dress) trees and two Blueberry Muffin Hawthorn (Rhaphiolepis umbellata (Thunb.) Makino) shrubs were planted in the bioswale. Runoff flowed into the bioswale from an adjacent 171 m2 panel of turf grass. An identically sized control bioswale consisting of non-disturbed native soil was located adjacent to the treatment bioswale. Surface runoff quantity and quality were measured during three experiments with different pollutant loads. When compared to the control, the treatment bioswale reduced surface runoff by 99.4%, and reduced nitrogen, phosphate, and total organic carbon loading by 99.1%, 99.5%, and 99.4%, respectively. After eight years, tree growth characteristics were similar across both sites.

Details

Title
Performance of Two Bioswales on Urban Runoff Management
Author
Xiao, Qingfu; McPherson, E Gregory; Zhang, Qi; Ge, Xinlei; Dahlgren, Randy
Publication year
2017
Publication date
Dec 2017
Publisher
MDPI AG
e-ISSN
24123811
Source type
Scholarly Journal
Language of publication
English
ProQuest document ID
2124499995
Copyright
© 2017. This work is licensed under http://creativecommons.org/licenses/by/3.0/ (the “License”). Notwithstanding the ProQuest Terms and Conditions, you may use this content in accordance with the terms of the License.