Content area

Abstract

Manufacturing Resources Planning (MRPII) is recognized as being an effective management system that has an excellent planning and scheduling capability which can offer a dramatic increase in customer service, significant gains in productivity, much higher inventory turns, and a greater reduction in material costs. This paper proposes an integrated system design and implementation approach to overcome the difficulties of MRPII implementation. It aims to formulate a standard process by combining strategic elements, problem definition, MRPII solutions, technical and procedural design, and implementation management in order to minimize the frustration and conflicts commonly found in MRPII implementation as well as to reduce disconnection among different stages of design and implementation. A hierarchical analysis technique using Integrated DEFinition Method (IDEF) is used to support the design and implementation management. The examples illustrate that it provides an invaluable support in the management of MRPII system.

Details

10000008
Title
The successful implementation of MRPII via a hierarchical modelling approach
Publication title
Volume
11
Issue
3
Pages
160-170
Number of pages
0
Publication year
1998
Publication date
1998
Publisher
Emerald Group Publishing Limited
Place of publication
Bradford
Country of publication
United Kingdom
ISSN
09576053
Source type
Scholarly Journal
Language of publication
English
Document type
Feature
ProQuest document ID
220027615
Document URL
https://www.proquest.com/scholarly-journals/successful-implementation-mrpii-via-hierarchical/docview/220027615/se-2?accountid=208611
Copyright
Copyright MCB UP Limited (MCB) 1998
Last updated
2025-11-19
Database
ProQuest One Academic