Content area

Abstract

Given a set of jobs and two batch processing machines (BPMs) arranged in a flow shop environment, the objective is to batch the jobs and sequence the batches such that the makespan is minimized. The job sizes, ready times, and processing times on the two BPMs are known. The batch processing machines can process a batch of jobs as long as the total size of all the jobs assigned to a batch does not exceed its capacity. Once the jobs are batched, the processing time of the batch on the first machine is equal to the longest processing job in the batch; processing time of the batch on the second machine is equal to the sum of processing times of all the jobs in the batch. The batches cannot wait between two machines (i.e., no-wait). The problem under study is NP-hard. We propose a mathematical formulation and present a particle swarm optimization (PSO) algorithm. The solution quality and run time of PSO is compared with a commercial solver used to solve the mathematical formulation. Experimental study clearly highlights the advantages, in terms of solution quality and run time, of using PSO to solve large-scale problems.

Details

Business indexing term
Title
Minimizing makespan in a two-machine no-wait flow shop with batch processing machines
Author
Muthuswamy, Shanthi 1 ; Vélez-Gallego, Mario C 2 ; Maya, Jairo 2 ; Rojas-Santiago, Miguel 3 

 Department of Technology, Northern Illinois University, Dekalb, IL, USA 
 Departamento de Ingeniería de Producción, Universidad EAFIT, Medellín, Colombia 
 Departamento de Ingeniería Industrial, Universidad del Norte, Barranquilla, Colombia 
Volume
63
Issue
1-4
Pages
281-290
Publication year
2012
Publication date
Nov 2012
Publisher
Springer Nature B.V.
Place of publication
Heidelberg
Country of publication
Netherlands
ISSN
02683768
e-ISSN
14333015
Source type
Scholarly Journal
Language of publication
English
Document type
Journal Article
Publication history
 
 
Online publication date
2012-01-21
Milestone dates
2012-01-05 (Registration); 2011-08-15 (Received); 2012-01-05 (Accepted)
Publication history
 
 
   First posting date
21 Jan 2012
ProQuest document ID
2262403476
Document URL
https://www.proquest.com/scholarly-journals/minimizing-makespan-two-machine-no-wait-flow-shop/docview/2262403476/se-2?accountid=208611
Copyright
The International Journal of Advanced Manufacturing Technology is a copyright of Springer, (2012). All Rights Reserved.
Last updated
2023-11-25
Database
ProQuest One Academic