Full text

Turn on search term navigation

© 2019. This work is licensed under https://creativecommons.org/licenses/by/4.0/ (the “License”). Notwithstanding the ProQuest Terms and Conditions, you may use this content in accordance with the terms of the License.

Abstract

[...]there are certain limits for the CTS and TDS of each relay as per (4) and (5): CTSimin≤CTSi≤CTSimax, TDSimin≤TDSi≤TDSimax, where CTSimin and CTSimax are the minimum and maximum values for the CTS of relay i according to the relay manufacturer. According to (7), the CTI is the OT difference between the back-relay j and the primary relay i. CTIk=Tjk−Tik, It is important to be mentioned that the CTI must be higher than CTImin , which is the minimum coordination time interval. 3. [...]the algorithm starts with reading the short circuit currents near the relays, then it applies the proposed MVO algorithm to choose TDS and Ip for each relay. [...]to verify the results obtained in Table 2, results are used to set the six relays, and the newly coordinated system is simulated using ETAP power stations simulation software.

Details

Title
Optimal Coordination of DOC Relays Incorporated into a Distributed Generation-Based Micro-Grid Using a Meta-Heuristic MVO Algorithm
Author
Abdelsalam, Mahmoud; Diab, Hatem Y
Publication year
2019
Publication date
Jan 2019
Publisher
MDPI AG
e-ISSN
19961073
Source type
Scholarly Journal
Language of publication
English
ProQuest document ID
2317066231
Copyright
© 2019. This work is licensed under https://creativecommons.org/licenses/by/4.0/ (the “License”). Notwithstanding the ProQuest Terms and Conditions, you may use this content in accordance with the terms of the License.