Content area

Abstract

A new approach to working set generation for personnel scheduling problems is presented. In full-time (FT) and mixed-workforce (MW) experiments, the schedules in the working sets from the use of 2-phase heuristic labor scheduling solution procedures are generated. The solution procedures were implemented on a 386 microcomputer and did not require the specification of the size of the working sets in advance. In the FT experiment, the general set-covering formulations (GscF) associated with the produced working sets were solved with integer programming. The new working set procedure yielded optimal integer solutions for all 36 test problems in the FT experiment. Owing to the size and complexity of the problem data in the MW experiment, the GSCFs associated with the working sets were solved with linear programming, and heuristic rounding procedures were applied to obtain feasible integer solutions.

Details

10000008
Business indexing term
Title
Microcomputer-based working set generation methods for personnel scheduling
Volume
15
Issue
10
Pages
74-63
Number of pages
12
Publication year
1995
Publication date
1995
Publisher
Emerald Group Publishing Limited
Place of publication
Bradford
Country of publication
United Kingdom
ISSN
01443577
e-ISSN
17586593
CODEN
IOPMDU
Source type
Scholarly Journal
Language of publication
English
Document type
Journal Article
Accession number
01135738
ProQuest document ID
232362721
Document URL
https://www.proquest.com/scholarly-journals/microcomputer-based-working-set-generation/docview/232362721/se-2?accountid=208611
Copyright
© MCB UP Limited 1995
Last updated
2024-12-04
Database
ProQuest One Academic