Full Text

Turn on search term navigation

© 2021. This work is published under https://creativecommons.org/licenses/by/4.0/ (the “License”). Notwithstanding the ProQuest Terms and Conditions, you may use this content in accordance with the terms of the License.

Abstract

Gully erosion can be a major disruptor to global fluvial sediment budgets. Gully erosion in the catchments of the Great Barrier Reef is attributed to 40 % of fine suspended sediment pollution to the freshwater and marine ecosystems downstream. Mitigating this source of erosion will have a lasting positive impact on the water quality of connected rivers and the receiving marine environment. Here we conduct a preliminary evaluation of the ability of intensive landscape-scale gully remediation to reduce suspended sediment and associated nutrient export from a catchment draining to the Great Barrier Reef. The gully remediation method was a first attempt, in the region, at investing a high level of financial (total cost of remediation AUD 90000) and logistical effort (e.g. intensive earthworks, including the establishment of an on-site quarry) to develop long-lasting erosion mitigation measures (i.e. regraded, compacted, and battered gully walls, rock armouring of banks and channel, and installation of rock check dams). A novel suspended sediment monitoring network, comprised of a suite of new and established automated monitoring methods capable of operating in remote environments, was used to evaluate the water quality of a remediated gully, a control gully, and their respective catchments. The recently developed pumped active suspended sediment (PASS) sampler optimised to sample ephemeral water flows was deployed in gully outlets and catchment runoff flow paths. This study demonstrates how the combination of low- and high-cost water quality monitoring techniques can be deployed in a configuration that ensures sample collection redundancy and complementary data collection between methods. Monitoring was conducted during two consecutive wet seasons and, thus, can only provide preliminary information. Monitoring over longer timescales (i.e. 5–10 years) will need to be carried out in order to validate the findings discussed herein. Samples collected from the remediated gully had significantly lower suspended sediment concentrations compared to the control gully, providing preliminary evidence that the remediation works were successful in stabilising erosion within the gully. Dissolved and particulate nutrient concentrations were also significantly lower in the remediated gully samples, consistent with the decreased suspended sediment concentrations. The novel combination of suspended sediment measurements from both the gully channels and overland flows in the surrounding gully catchments suggests that sediment and nutrients at the remediated site are likely sourced from erosion processes occurring within the catchment of the gully (at relatively low concentrations). In contrast, the primary source of suspended sediment and associated nutrients at the control gully was erosion from within the gully itself. This study demonstrates the potential of landscape-scale remediation as an effective mitigation action for reducing suspended sediment and nutrient export from alluvial gullies. It also provides a useful case study for the monitoring effort required to appropriately assess the effectiveness of this type of erosion control.

Details

Title
Intensive landscape-scale remediation improves water quality of an alluvial gully located in a Great Barrier Reef catchment
Author
Doriean, Nicholas J C 1   VIAFID ORCID Logo  ; Bennett, William W 1 ; Spencer, John R 1 ; Garzon-Garcia, Alexandra 2 ; Burton, Joanne M 2 ; Teasdale, Peter R 3 ; Welsh, David T 4 ; Brooks, Andrew P 1 

 Coastal and Marine Research Centre, Griffith University, Southport 4215, Queensland, Australia 
 Department of Environment and Science, Queensland Government, Brisbane 4102, Queensland, Australia 
 UniSA STEM, Scarce Resources and Circular Economy (ScaRCE), University of South Australia, Adelaide 5000, South Australia, Australia; Future Industries Institute, University of South Australia, Adelaide 5000, South Australia, Australia 
 School of Environment and Science, Griffith University, Southport 4215, Queensland, Australia 
Pages
867-883
Publication year
2021
Publication date
2021
Publisher
Copernicus GmbH
ISSN
10275606
e-ISSN
16077938
Source type
Scholarly Journal
Language of publication
English
ProQuest document ID
2492157832
Copyright
© 2021. This work is published under https://creativecommons.org/licenses/by/4.0/ (the “License”). Notwithstanding the ProQuest Terms and Conditions, you may use this content in accordance with the terms of the License.