It appears you don't have support to open PDFs in this web browser. To view this file, Open with your PDF reader
Abstract
Utilization of Information Systems in Dies Control for Improvement of Quality and Production Efficiency in Manufacturing Industry is a system that is used to anticipate damage to dies before the dies are used, because if a damaged dies is used will be very detrimental to the company. There are 4 views: Dies master, Entry production, Dies maintenance and dashboard. Dies master is a page used for initial dies data input. Entry Production is a page that is used to input daily production output because from this page you will get actual OK production data and actual NG production which will be used to compare between the maximum use of dies and the number of actual OK production and actual NG production. If the sum of the actual Production OK and the actual NG production is greater than the maximum use of dies, the dies must be maintained immediately. Maintenance Dies serves as input data for maintenance Dies, in the maintenance dies page there are also 3 features: Entry Maintenance Dies functions as a date data input menu and only comments mainly because other data already exists on the master dies, Summary on Maintenance dies serves to display the date or last maintenance date and the last maintenance time interval with today, the Details on the Maintenance Dies function displays all dates if the summary only shows one last date the details display all dates, so you can find out how many times the dies have been maintained. and the last is this Dashboard function to display the results of all data that has been inputted. The main function is to display the status of dies, it will be seen if the red color of the dies has to be fixed, if the yellow color is warning because the number of hits is 90% of the maximum result of using dies, if green can still be used.
You have requested "on-the-fly" machine translation of selected content from our databases. This functionality is provided solely for your convenience and is in no way intended to replace human translation. Show full disclaimer
Neither ProQuest nor its licensors make any representations or warranties with respect to the translations. The translations are automatically generated "AS IS" and "AS AVAILABLE" and are not retained in our systems. PROQUEST AND ITS LICENSORS SPECIFICALLY DISCLAIM ANY AND ALL EXPRESS OR IMPLIED WARRANTIES, INCLUDING WITHOUT LIMITATION, ANY WARRANTIES FOR AVAILABILITY, ACCURACY, TIMELINESS, COMPLETENESS, NON-INFRINGMENT, MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE. Your use of the translations is subject to all use restrictions contained in your Electronic Products License Agreement and by using the translation functionality you agree to forgo any and all claims against ProQuest or its licensors for your use of the translation functionality and any output derived there from. Hide full disclaimer
Details
1 Department of Electrical Engineering, Faculty of Engineering, Universitas Sebelas Maret, Jl. Ir. Sutami No.36 A, Jebres, Surakarta 57126, Indonesia