Abstract
Simulating transient processes of pumped-storage power plants is essential for the design and optimization of pump-turbine and water conveyance system. Because pressure pulsations and runner forces cannot be obtained from the traditional 1D transient simulation methods, 3D CFD simulations are necessary. In this study, the fast runaway transient process, occurring after the pump trip of a pumped-storage plant with a head of 700m, was simulated by using the CFD method that couples the 1D water conveyance system and 3D turbine. The phenomena, composed of water hammer fluctuations, pressure pulsation transitions, and flow pattern evolutions, were described and analyzed. We found that the flow patterns and pressure pulsations change violently as the working point goes through different regions. Especially, the pressure pulsations and unbalanced radial runner forces are the most severe in the S-shaped characteristic region. The strong impact on blades, large scale recirculating vortices in blade passages, obvious rotating stalls in vane and blade regions, transitional backflows at runner inlet and outlet, and strong circumferential velocity in vaneless space are the main sources. The dynamic working trajectory does not follow the measured static characteristic curve and demonstrates an undamped loop in the S-shaped region. This paper provides some evidence on the relations between flow structure and pressure pulsation features, although the mechanism of dynamic characteristics needs further investigations.
You have requested "on-the-fly" machine translation of selected content from our databases. This functionality is provided solely for your convenience and is in no way intended to replace human translation. Show full disclaimer
Neither ProQuest nor its licensors make any representations or warranties with respect to the translations. The translations are automatically generated "AS IS" and "AS AVAILABLE" and are not retained in our systems. PROQUEST AND ITS LICENSORS SPECIFICALLY DISCLAIM ANY AND ALL EXPRESS OR IMPLIED WARRANTIES, INCLUDING WITHOUT LIMITATION, ANY WARRANTIES FOR AVAILABILITY, ACCURACY, TIMELINESS, COMPLETENESS, NON-INFRINGMENT, MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE. Your use of the translations is subject to all use restrictions contained in your Electronic Products License Agreement and by using the translation functionality you agree to forgo any and all claims against ProQuest or its licensors for your use of the translation functionality and any output derived there from. Hide full disclaimer
Details
1 State Key Laboratory of Water Resources and Hydropower Engineering Science, Wuhan University, Wuhan 430072, China; Ministerial Key Lab of Hydraulic Machinery Transients, Ministry of Education, Wuhan University, Wuhan 430072, China
2 School of Environmental Science and Engineering, Xiamen University of Technology, Xiamen 361024, China
3 Dongfang Electric Corporation Ltd, Chengdu 611731, China
4 State Key Laboratory of Water Resources and Hydropower Engineering Science, Wuhan University, Wuhan 430072, China