Document Preview Unavailable

A flow shop batch scheduling model with pre-processing and time-changing effects to minimize total actual flow time

Kurniawan, Dwi; Rinto Yusriski; Isnaini, Mohammad Mi'radj; Ma'ruf, Anas; Abdul Hakim Halim.  Journal of Industrial Engineering and Management Vol. 17, Iss. 2,  (2024): 542-561.

You might have access to this document