© 2019 by the authors. Licensee MDPI, Basel, Switzerland. This article is an open access article distributed under the terms and conditions of the Creative Commons Attribution (CC BY) license (http://creativecommons.org/licenses/by/4.0/). Notwithstanding the ProQuest Terms and Conditions, you may use this content in accordance with the terms of the License.

Abstract

With the improvement of short-term flood forecasting and short-term rainfall forecast accuracy, as well as the advance of hydrological and meteorological information collection and collation methods, the reservoir flood regulation method taking rainfall or inflow forecast into consideration is gaining more and more attention. As the index of Forecast-Based Operation (FBO), the forecasted factor plays an important part in determining success or failure of FBO due to its uncertainty and accuracy. In this study, possible risk sources were analyzed considering the process and the characteristics of reservoir flood regulation firstly, and the uncertainty of the forecast information and the FBO risks were discussed based on hypothesis testing. Then, combined with the case study of applying FBO on Ankang Reservoir, in which the forecasted net rainfall was selected as the index of the FBO rules, the probability distribution of the forecasted net rainfall errors was derived as the basis of risk analysis. Finally, FBO risk analysis was conducted based on Monte Carlo method for several real flood processes, while a simulation was also carried out with the Conventional Operation (CO) for contrast. The results indicate that the maximum risk was reduced more than half when FBO was adopted. Consequently, the possible remedial measures were put forward in the case of invalid forecast happened based on simulation and the analysis of the principle of flood regulation. The conclusions and methods in this research provide ideas for real-time flood regulation and risk management of reservoirs.

Details

Title
Risks Analysis and Response of Forecast-Based Operation for Ankang Reservoir Flood Control
Author
Liu, Zhao 1   VIAFID ORCID Logo  ; Lyu, Jiawei 1 ; Jia, Zhifeng 1   VIAFID ORCID Logo  ; Wang, Lixia 2 ; Xu, Bin 3 

 School of Environmental Science and Engineering, Chang’an University, 126 Yanta Road, Xi’an 710054, China; Key Laboratory of Subsurface Hydrology and Ecological Effects in Arid Region of the Ministry of Education, Chang’an University, 126 Yanta Road, Xi’an 710054, China 
 School of Earth Science and Resources, Chang’an University, 126 Yanta Road, Xi’an 710054, China 
 School of Environmental Science and Engineering, Chang’an University, 126 Yanta Road, Xi’an 710054, China 
First page
1134
Publication year
2019
Publication date
2019
Publisher
MDPI AG
e-ISSN
20734441
Source type
Scholarly Journal
Language of publication
English
ProQuest document ID
2550326013
Copyright
© 2019 by the authors. Licensee MDPI, Basel, Switzerland. This article is an open access article distributed under the terms and conditions of the Creative Commons Attribution (CC BY) license (http://creativecommons.org/licenses/by/4.0/). Notwithstanding the ProQuest Terms and Conditions, you may use this content in accordance with the terms of the License.