Abstract

Under complex geological conditions, the use of rotary drilling rigs to excavate pile foundations to form holes, unfavorable factors such as silt and groundwater will bring problems such as deviated holes and collapsed holes. Research on construction technology is required to overcome these difficulties. In this paper, the technology of rotary excavation and hole formation in a thick seam and high groundwater area of a seashore is studied. The influence of mud parameters and drilling speed on the quality of hole formation is explored. An efficient drilling rate and an economical and reasonable mud parameters are obtained.

Details

Title
Research on Construction Technology of cast-in-situ bored pile under Complex Geological Conditions
Author
Wu, Y H 1 ; Zhou, Z 2 ; Chen, W Q 1 ; Liu, S Y 2 ; Zhang, B C 2 ; Huang, H F 3 

 Guangzhou metro group co. LTD, Guangzhou, China 
 China railway construction south China construction co. LTD, Guangzhou, China 
 School of Civil and Transportation Engineering, Guangdong University of Technology, Guangzhou, China 
Publication year
2020
Publication date
Jun 2020
Publisher
IOP Publishing
ISSN
17551307
e-ISSN
17551315
Source type
Scholarly Journal
Language of publication
English
ProQuest document ID
2555834972
Copyright
© 2020. This work is published under http://creativecommons.org/licenses/by/3.0/ (the “License”). Notwithstanding the ProQuest Terms and Conditions, you may use this content in accordance with the terms of the License.