It appears you don't have support to open PDFs in this web browser. To view this file, Open with your PDF reader
Abstract
The systematic analysis of optimizing the producer-consumer structure transportation problem is carried out in paper. It is in demand for the timber industry complex. The well-known minimum transportation cost objective is solved as a static problem using the linear programming method. Due to complicated market development conditions, it is necessary to set up and solve the problem of minimizing transportation time (quick performance) as a dynamic problem. Solving it in general case, the transportation cost may be different from the minimum cost determined by the static problem solution. The dynamic problem solution is based on the carrier’s vehicle performance information used for determining the functional time spent per transported product unit. The rational decision making under market conditions is only possible by adopting a compromise obtained on the basis of the multi-criteria optimization theory. The task of determining the compromise area of two-criteria optimization (cost-time minimum ratio) is decided by experts. It is solved using the linear programming method for static and dynamic problems and their linear approximation. To develop a compromise transportation plan becomes the subject of solving the inverse transportation problem. The systemic “producer – transport – consumer” approach is necessary for sustainable timber industry complex development, when the producer-transport system makes up a single production process. Its parameters are determined on the basis of systems theory.
You have requested "on-the-fly" machine translation of selected content from our databases. This functionality is provided solely for your convenience and is in no way intended to replace human translation. Show full disclaimer
Neither ProQuest nor its licensors make any representations or warranties with respect to the translations. The translations are automatically generated "AS IS" and "AS AVAILABLE" and are not retained in our systems. PROQUEST AND ITS LICENSORS SPECIFICALLY DISCLAIM ANY AND ALL EXPRESS OR IMPLIED WARRANTIES, INCLUDING WITHOUT LIMITATION, ANY WARRANTIES FOR AVAILABILITY, ACCURACY, TIMELINESS, COMPLETENESS, NON-INFRINGMENT, MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE. Your use of the translations is subject to all use restrictions contained in your Electronic Products License Agreement and by using the translation functionality you agree to forgo any and all claims against ProQuest or its licensors for your use of the translation functionality and any output derived there from. Hide full disclaimer
Details
1 Departament of Techological processes and machines of the forest complex, Saint-Petersburg State Forest Technical University, 5 Institutskiy lane, Saint-Petersburg 194021, Russian Federation