It appears you don't have support to open PDFs in this web browser. To view this file, Open with your PDF reader
Abstract
The large-scale commissioning of combined heat and power unit leads to difficulty of peak regulation and wind consumption, and combined heat and power optimized dispatch is one of effective ways to solve this problem. Under existing optimized dispatch models of combined heat and power system, pre-decided unit commitment scheme may cause a large amount of wind curtailment because of excessive operating units and total minimum technical output of units. In view of these problems, through combination of unit commitment and optimized dispatch, an optimized dispatch model of combined heat and power system unit commitment considering heating network characteristics is established. Similarities and differences of heat and power energy transmission are analyzed, heat load partition balance equation as well as positive and negative spinning reserve constrains of thermal system partition are established, and influence of heating network characteristics, including time delay and heat loss, on unit commitment scheme and wind curtailment is studied. A numerical example shows that heating network characteristics influence unit commitment scheme (one unit shuts down an hour ahead and starts up an hour later). Besides, it shows that while meeting power and heat load demand, the model of this paper can timely start up or shut down units according to load change and spinning reserve demand, reduce total minimum technical output of operating units to 632.4 MW, and further improve wind power accommodation quantity to 3410.24 MW·h.
You have requested "on-the-fly" machine translation of selected content from our databases. This functionality is provided solely for your convenience and is in no way intended to replace human translation. Show full disclaimer
Neither ProQuest nor its licensors make any representations or warranties with respect to the translations. The translations are automatically generated "AS IS" and "AS AVAILABLE" and are not retained in our systems. PROQUEST AND ITS LICENSORS SPECIFICALLY DISCLAIM ANY AND ALL EXPRESS OR IMPLIED WARRANTIES, INCLUDING WITHOUT LIMITATION, ANY WARRANTIES FOR AVAILABILITY, ACCURACY, TIMELINESS, COMPLETENESS, NON-INFRINGMENT, MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE. Your use of the translations is subject to all use restrictions contained in your Electronic Products License Agreement and by using the translation functionality you agree to forgo any and all claims against ProQuest or its licensors for your use of the translation functionality and any output derived there from. Hide full disclaimer
Details
1 National Electric Power Dispatching and Control Center, Beijing 100031, China
2 School of Electrical Engineering and Automation, Harbin Institute of Technology, Harbin 150001, Heilongjiang Province, China





