Abstract

In the EPC project, the purchase cost of equipments accounted for about 60% of the total project cost, thus, the selection of equipment suppliers has an important influence on the EPC project. This paper, took EPC project for the phase I engineering of Guizhou Huaxi Yunding wind power plant as research background, constructed the evaluation index system for the selection of equipment suppliers for wind power generation EPC project from multiple perspectives, and introduced matter-element extension evaluation model to evaluate the selection of equipment suppliers for this project from the qualitative and quantitative point of view. The result is consistent with the actual situation, which verifies the validity and operability of this method.

Details

Title
Study on the Selection of Equipment Suppliers for Wind Power Generation EPC Project
Author
Yang, Yuanyue 1 ; Li, Huimin 2 

 College of Water Conservancy and Hydropower Engineering, Hohai University, Nanjing 210098, China; Design Management Centre of South-to-North Water Diversion Project Commission, Beijing, 100038, China 
 North China University of Water Resources and Electric Power, Zhengzhou 450011, China. 
Publication year
2017
Publication date
Dec 2017
Publisher
IOP Publishing
ISSN
17551307
e-ISSN
17551315
Source type
Scholarly Journal
Language of publication
English
ProQuest document ID
2558401922
Copyright
© 2017. This work is published under http://creativecommons.org/licenses/by/3.0/ (the “License”). Notwithstanding the ProQuest Terms and Conditions, you may use this content in accordance with the terms of the License.