With the total 600MW power production capacity, Kriegers Flak will be the largest offshore wind power plant (OWPP) in Denmark. Kriegers Flak will utilize the two unequal sections, 400MW and 200MW, on the two offshore platforms interconnected via a 9 km 200kV cable and connected to the onshore substation via two 80 km 220kV cables. From the onshore 220kV substation, the 220kV connections continue to the two different 400/220kV substations of the Danish transmission grid. From the 400MW offshore platform, the connection continues to the 150kV offshore infrastructure of Germany. The Kriegers Flak grid connection resamples a meshed offshore grid (MOG) which increases complexity of and requirements to its overall voltage and reactive power control. This presentation describes how the overall voltage and reactive power control system is proposed and designed for optimized operation and reduction of the stress and efforts on the control equipment of the Kriegers Flak 220kV system.
You have requested "on-the-fly" machine translation of selected content from our databases. This functionality is provided solely for your convenience and is in no way intended to replace human translation. Show full disclaimer
Neither ProQuest nor its licensors make any representations or warranties with respect to the translations. The translations are automatically generated "AS IS" and "AS AVAILABLE" and are not retained in our systems. PROQUEST AND ITS LICENSORS SPECIFICALLY DISCLAIM ANY AND ALL EXPRESS OR IMPLIED WARRANTIES, INCLUDING WITHOUT LIMITATION, ANY WARRANTIES FOR AVAILABILITY, ACCURACY, TIMELINESS, COMPLETENESS, NON-INFRINGMENT, MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE. Your use of the translations is subject to all use restrictions contained in your Electronic Products License Agreement and by using the translation functionality you agree to forgo any and all claims against ProQuest or its licensors for your use of the translation functionality and any output derived there from. Hide full disclaimer
Details
1 Energinet, Transmission System Operator of Denmark, Tonne Kjærsvej 65, 7000 Fredericia, Denmark
2 Technical University of Denmark, Dept. of Electrical Engineering, Ørsted Plads, Building 348, 2800 Kgs. Lyngby, Denmark