1. Introduction
The technology principle and the operation process of the top-down construction are fully used for reference in the construction technology of the underground space in existing buildings, which can be regarded as the extension of the application for the top- down method technology in foundation pit engineering [1–5]. Generally, the overall operation process is as follows: first, the surrounding enclosure structure and the vertical support system are constructed; then, the earthwork excavation is carried out in the process of top-down construction, and the horizontal supporting structures such as underground beams and slabs are constructed at the same time; then, the foundation slab is poured to the base elevation after the excavation; finally, the vertical bearing components such as the basement exterior wall, the column, and the wall are constructed. When the vertical bearing components of the basement reach the design strength, the vertical temporary underpinning structures (such as anchor static pressure pile group, existing engineering pile group, etc.) within the height range of the new basement should be chiseled out. The operation process is a dynamic construction process, in which the design of the vertical underpinning structure system is one of the key links in the top-down construction technology of existing buildings [6–10].
The application of the top-down construction for adding layers under existing buildings is different from that of the conventional top-down construction. As a result, the load changes of the vertical underpinning structure system in the dynamic construction process are also quite different. The conventional top-down construction is aimed at synchronous construction of the underground and the above ground structures, and the load of the vertical underpinning structure system is gradually increased with the construction process. While the top-down construction for adding a layer under existing buildings is to build a new underground space when the above ground structure has been completed, the upper load must be transferred to the vertical underpinning structure system before the bottom top-down excavation [6, 11–14], which is relatively more difficult to design.
The vertical underpinning structure system is generally composed of the transfer bearing platform and the erect column pile. The erect column pile can adopt an additional anchor static pressure pile or existing engineering pile, and the layout forms include “one- column-one-pile” and “one-column-multi-pile”. The anchor static pressure pile is generally used in the low-rise existing buildings, and it is widely applied under the condition of limited construction space [15–17]. However, for the high-rise existing buildings with the pile foundation, anchor piles are generally added before the excavation. Moreover, together with existing engineering piles, they are used as the vertical support structure system in the construction stage to compensate for the post-load increase and achieve higher bearing capacity. The vertical temporary underpinning technology has high requirements, great difficult and complex joint connection, and there are few related research literature studies at home and abroad [18, 19]. In addition, the assessment of the bearing capacity of the foundation is important in practice [20, 21], so the effective evaluation of the bearing capacity of an existing engineering pile group is also a great significant prerequisite to ensure its safe bearing capacity.
In this paper, the bearing capacity for the existing engineering pile group during the dynamic top-down construction for layer adding is studied as the research object. First, the linear eigenvalue method is used to research the influences of the lateral restraint on bearing capacity for the existing engineering pile group. Then, the nonlinear extreme point stability method with initial imperfection is used to study the amplification range of the corresponding calculation length. Finally, the reference suggestion for the value of the column pile stability coefficient in the existing code is proposed, which provides safety guarantee for the practical engineering application.
2. Connection Structure and Bearing Calculation Theory
2.1. Vertical Support Underpinning the Connection Structure
Taking a high-rise building with the existing pile foundation as an example, a new basement is built by using the technology of the top-down construction for layer adding. Figure 1 shows the scene photo of the existing high-rise building which was built in 1997 with 13 floors above the ground and 1 floor underground. Figure 2 shows the pile plan of the existing engineering piles.
[figure(s) omitted; refer to PDF]
The vertical support section diagram of the basement layer adding during the top-down construction is shown in Figure 3. A vertical underpinning structure supported by two or more piles is arranged at the bottom of each frame column for vertical load conversion. When the existing engineering pile group under the column is supported by a multipile group (such as two piles, three piles, and four piles), the principle of equivalent section bending stiffness can be adopted to simplify the analysis into a two-pile support in plane for unified consideration and to simplification of calculation workload.
[figure(s) omitted; refer to PDF]
For the existing high-rise buildings, if only the vertical underpinning structure system is used to resist the horizontal action such as the wind load, its lateral stiffness will be very difficult to meet the requirements of the relevant code. In this case, by using the horizontal supporting beams of the foundation pit bracing structures (such as the diaphragm wall, the row pile), the upper main building and the vertical underpinning system can be well laterally restrained. Therefore, the bearing capacity calculation of the existing engineering pile group can be analyzed under the condition of no lateral displacement.
2.2. Dynamic Construction Sequence of the Top-Down Construction for Layer Adding
Step 1.
Construction of the surrounding enclosure structures, including diaphragm walls and row piles, etc.
Step 2.
The horizontal support beams are constructed and connected with the basement roof and the transfer-bearing platform of the existing building to form a vertical support system without lateral displacement.
Step 3.
Excavation of the earthwork and construction of the temporary steel bracings between existing engineering piles, so that the engineering pile group is integrated as a whole.
Step 4.
After excavation to the elevation of the foundation, the static pressure anchor pile for compensating load is constructed, and then, the foundation slab is poured.
Step 5.
Construction of the basement exterior wall, frame column, and other vertical load-bearing components, and then the design strength should be reached.
Step 6.
The temporary steel bracings between piles should be removed, and then, the existing pile groups within the basement floor height range are cut off.
2.3. Bearing Capacity Calculation
The upper and lower parts of the existing pile group are restrained by the lateral restraint of the constructed floor structure and the unexcavated foundation soil, respectively. The bearing capacity of the existing engineering pile group changes with the dynamic change of the lateral restraint. Therefore, the determination of the calculation length and the bearing capacity should be analyzed according to different working conditions, and the value should be designed according to the most unfavorable working condition [22–24].
According to Euler’s formula, the critical stability load
The corresponding effective length coefficient u is as follows:
First, the stability load
3. Finite Element Analysis Model
Considering the need to ensure the bearing performance of the upper structure in the excavation stage of the top-down construction for layer adding, the lateral restraint of the transfer bearing platform is provided by the horizontal support beam and the enclosure structure, which is the condition without lateral displacement. The eigenvalue stability method is applied to study the bearing capacity for existing engineering piles group under the dynamic top-down excavation.
3.1. Calculation Model and Simplification
Taking the second underground layer constructed by the top-down construction for layer adding as an example, the bearing platform of each frame column is simplified as a two-pile bearing platform. Considering the dynamic excavation of the foundation soil to the base elevation, the critical stability load and the effective length coefficient of the existing engineering pile group are analyzed.
The two-pile bearing platform is supported by bored piles with the diameter D, the concrete grade C30, and the elastic modulus Ec = 30 MPa, which are imbedded in the rock layer (fixed support) at the bottom, and hinged or rigidly connected to the bearing platform. The two-pile bearing platform can be considered as an equivalent concrete beam supported by a one-way hinge at both ends, with the concrete grade C30, the rectangular section 2D × 1.5 m, the elastic modulus Eb1 = 30 GPa, and the length Lb1 = 5D. The temporary steel bracings are hinged or rigidly connected to the concrete piles at both ends, with the section H200 × 100 × 6 × 8 mm and the material Q235B. When the excavation reaches the base, the depth of the concrete pile into the soil is h, and the pile calculation part length
[figure(s) omitted; refer to PDF]
3.2. Horizontal Resistance of the Foundation Soil
The horizontal elastic resistance is subjected to the embedded part of the concrete pile by the foundation soil [25–27]. The m method is used here for assuming that the horizontal elastic resistances q(x) of the foundation soil increases linearly with the depth of the soil x, which is shown by the following equation:
3.3. Finite Element Model
Based on the ABAQUS, the horizontal elastic resistance is simulated by the unidirectional grounding spring element with an interval of 1.0 m. The spring stiffness Ka is determined according to (3), as shown by the following equation:
[figure(s) omitted; refer to PDF]
4. Influencing Factors Analysis for the Bearing Capacity
The main influence factors on the bearing capacity for existing engineering pile group include the horizontal elastic resistance of the foundation soils, the diameter of piles body, and the bending stiffness of the temporary steel bracings between piles.
As for the linear eigenvalue stability method, by considering the existing engineering pile group without initial imperfection, the load corresponding to the first buckling mode is obtained as the critical ultimate load. This method is simple and fast in calculation and convenient for a large number of parametric analysis, which is adopted for analysis in this section.
4.1. Influence of the Horizontal Resistance of Foundation Soils
Taking the pile diameter D = 600 mm as an example, the influence of the general non-rock foundation soil m = 0.1∼6.0 MPa/m2 on the bearing capacity for existing engineering piles group is studied, excluding the effect of the temporary steel bracing.
The curves of the critical load factor α and the effective length coefficient u with the m value are shown in Figures 6 and 7, respectively, corresponding to the critical loading
[figure(s) omitted; refer to PDF]
It turns out that the bearing capacity for the case of the rigid pile top is higher than that of the case of the hinged pile top, and the effective length coefficient is opposite. Taking m = 1.0 MPa/m2 as an example, the α value of the case of the hinged pile top and the case of the rigid pile top are 8.439 and 13.573, respectively, and the bearing capacity of the latter is about 1.61 times of the former. Therefore, strengthening the level of the rigid connection for the pile top is an effective way to improve the bearing capacity during the top-down construction.
4.2. Influence of the Pile Diameter
Taking the horizontal resistance coefficient m = 1.0 MPa/m2 as an example, the pile diameter D is taken as the commonly used range of 600 mm∼900 mm for analysis. The curves of the load factor α and the effective length coefficient u with the pile body diameter D are shown in Figures 8 and 9, respectively. The results show that the influence of the pile body diameter D are great on the bearing capacity and the effective length for both two cases of the pile top connection. Moreover, the α value increases with the increases of the D value, while the u value decreases with the increases of the D value.
[figure(s) omitted; refer to PDF]
4.3. Influence of the Bending Stiffness of Temporary Steel Bracing
The influence of the temporary steel bracing on the stability of the concrete pile is caused by the lateral restraint on the middle position of the pile, which is due to the bending stiffness of the steel bracing. Taking m = 1.0 MPa/m2 and D = 600 mm as an example, the hinged joint and the rigid joint are considered respectively for the connection of the steel bracing and the concrete pile. The linear stiffness ratio of the steel bracing to the concrete pile is shown by the following equation:
The curves of the critical load factor α and the effective length coefficient u with the
[figure(s) omitted; refer to PDF]
When the connecting ends of the steel bracing are rigid, the bearing capacity of the Case 2 is higher than that of the Case 1. Taking
5. Nonlinear Bearing Capacity with Initial Imperfections
The nonlinear stability analysis belongs to the problem of the extreme point instability. Taking the second underground layer constructed by the top-down construction for layer adding in Section 3 as an example, the initial geometric imperfections are applied in the analysis to obtain the full stable equilibrium path of the existing engineering pile group.
5.1. Types of the Initial Geometric Imperfection
There are two types for the initial geometric imperfection: the consistent mode imperfection and the lateral displacement imperfection. For the former, the first buckling mode of the engineering pile group is taken as its initial imperfection, and the maximum deformation is the imperfection amplitude. For the latter, the deformation of the engineering piles group caused by the lateral displacement of the bearing platform is taken as the initial imperfection, and the end lateral displacement is the imperfection amplitude. The imperfection amplitude is generally selected as 1/1000∼ 1/200 of the pile group length.
5.2. Influence of the Consistence Mode Imperfection
Taking m = 1.0 MPa/m2 and D = 600 mm as an example, the hinged pile top (Case 1) and the rigid pile top (Case 2) are considered for analysis, excluding the effect of the temporary steel bracing. The total length of the pile group is 32m, and the corresponding imperfection amplitudes
The curves of the critical load factor α and the effective length coefficient u with the axial displacement
[figure(s) omitted; refer to PDF]
The α value and the u value of different imperfection amplitudes are shown in Table 1, where α0 and u0 is the load factor and the effective length coefficient of the linear eigenvalue buckling analysis, respectively. It can be seen that when the range of the imperfection amplitude is 35 mm∼ 160 mm, the nonlinear effective length coefficients of the case 1 and the case 2 are about 1.04∼1.18 times and 1.04∼1.15 times of the corresponding linear effective length coefficients, respectively. In the practical engineering design, it is suggested that the effective length of the existing engineering pile group should be multiplied by the amplification factor
Table 1
Values of α and u for different imperfection amplitudes.
Case imperfection amplitude (mm) | Case 1 | Case 2 | ||||||
35 | 100 | 160 | 35 | 100 | 160 | |||
Linear | α0 | 8.439 | 13.573 | |||||
u0 | 1.486 | 1.172 | ||||||
Nonlinear | Consistent mode imperfection | 0.17 | 0.26 | |||||
α | 7.859 | 6.864 | 6.060 | 12.463 | 11.297 | 10.291 | ||
u | 1.540 | 1.648 | 1.754 | 1.223 | 1.284 | 1.346 | ||
u/u0 | 1.04∼1.18 | 1.04∼1.15 | ||||||
Lateral displacement imperfection | 0.17 | 0.26 | ||||||
α | 8.283 | 7.915 | 7.585 | 13.150 | 12.682 | 12.386 | ||
u | 1.500 | 1.534 | 1.567 | 1.190 | 1.212 | 1.227 | ||
u/u0 | 1.01∼1.06 | 1.02∼1.05 |
5.3. Influence of the Lateral Displacement Imperfection
The model parameters and the imperfection amplitude are described in Section 5.2, and the initial imperfection form is selected as the lateral displacement imperfection form of the foundation pit. The curves of the critical load factor α and the effective length coefficient u with the axial displacement
[figure(s) omitted; refer to PDF]
It turns out from Table 1 that when the ranges of the imperfection amplitude is 35 mm∼160 mm, the nonlinear effective length coefficients of the case 1 and the case 2 are about 1.01∼1.06 times and 1.02∼1.05 times of the corresponding linear effective length coefficients, respectively. In the practical engineering design, it is suggested that the effective length of the existing engineering pile group should be multiplied by the amplification factor
6. Bearing Capacity considering the Buckling Effect
The present solution of the nonlinear effective length coefficient
Considering the compression buckling effect of the high-rise cap pile, and according to the items 6.3.10 ∼ 6.3.11 in technical specification for building foundation excavation engineering constructed by the top-down method (DB33/T1112-2015) [28] and the items 5.8.2∼5.8.4 in technical code for building pile foundation (JGJ 94-2008) [29], the bearing capacity
The comparison between the present solution and the code solution is shown in Table 2, where l0 is the actual length of the pile calculation part and α is the horizontal deformation coefficient of the pile. Considering the need of safety for the engineering design, the effective length of the single pile considering compression buckling is considered as the unfavorable working condition of the hinged pile top.
Table 2
Comparison of the bearing capacity with the compression buckling effect.
Case diameter of the pile body (mm) | Hinged pile top | ||||
600 | 700 | 900 | |||
Present solution | Linear effective length coefficient | u | 1.486 | 1.577 | 1.769 |
Nonlinear effective length coefficient | uc = βu | 1.783 | 1.892 | 2.123 | |
Nonlinear effective length (m) | lc1 = βul0 | 8.915 | 9.460 | 10.615 | |
Compression buckling coefficient | φ1 | 0.836 | 0.882 | 0.924 | |
Stability capacity with compression buckling (kN) | Nu1 | 2530 | 3640 | 6304 | |
Code solution | Effective length with compression buckling (m) | lc = 0.7(l0 + 4/α) | 11.142 | 11.971 | 13.497 |
Compression buckling coefficient | φ | 0.661 | 0.748 | 0.830 | |
Stability capacity with compression buckling (kN) | Nu | 2004 | 3087 | 5663 | |
Nu1/Nu | 1.26 | 1.18 | 1.11 |
It can be seen from Table 2 that the present solution is about 1.10∼1.30 times of the code solution for the bearing performance of the existing engineering piles group, and the code solution is relatively safe. In practical engineering design, the code solution of the bearing capacity can be relaxed by 10%∼30% according to the actual situation and can also be considered as the design margin.
7. Conclusion
In this paper, the linear eigenvalue stability analysis and the nonlinear stability analysis are applied to study the effective length coefficient and obtain the bearing capacity with the buckling effect. The conclusions are as follows:
(1) The lateral restraint is the determining factor affecting the bearing capacity of the existing engineering piles group. Moreover, the critical stability load and the effective length coefficient of the engineering pile group can be obtained by the finite element method.
(2) For both the hanged pile top and the rigid pile top, the critical stability load factors α increase with the increases of the horizontal resistance coefficients m, while the corresponding effective length coefficient u decrease. When m > 2.0 MPa/m2, the change ranges of the α value and the u value becomes gentle.
(3) The critical stability load factor α increases with the increase of both piles group diameter D and bracing bending stiffness K1. Moreover, when K1 > 2.0, the changes of α and u tend to be gentle. The hinged temporary steel bracing has no effect on the stability of the existing engineering pile group.
(4) The nonlinear stability load with the initial imperfection is slightly smaller than the linear eigenvalue stability load,and the larger the amplitude of the initial imperfection, the smaller the nonlinear critical stability load. In practical engineering, the effective length coefficients of the existing engineering pile group with the consistent mode imperfection and the lateral displacement imperfection should be enlarged by 1.20 and 1.10 times, respectively.
(5) The present solution is about 1.10∼1.30 times of the code solution on the bearing capacity for existing engineering piles group, and the code solution is relatively safe. In practical engineering design, the code solution of the bearing capacity can be relaxed by 10%∼30% according to the actual situation and can also be considered as the design margin.
Acknowledgments
The research was supported by the Basic Public Research Project of Zhejiang Province (No. LGG22E080005), the National Natural Science Foundation of China (Nos. 52078452 and 52178400), and the Scientific Research Fund of Zhejiang Provincial Education Department (No. Y202146072).
[1] Q. P. Weng, Z. H. Xu, Z. H. Wu, R. B. Liu, "Design and performance of the deep excavation of a substation constructed by top-down method in Shanghai soft soils," Procedia Engineering, vol. 165, pp. 682-694, DOI: 10.1016/j.proeng.2016.11.766, 2016.
[2] P. Jamsawang, S. Jamnam, P. Jongpradist, P. Tanseng, S. Horpibulsuk, "Numerical analysis of lateral movements and strut forces in deep cement mixing walls with top-down construction in soft clay," Computers and Geotechnics, vol. 88, pp. 174-181, DOI: 10.1016/j.compgeo.2017.03.018, 2017.
[3] Y. Tan, H. H. Zhu, F. Peng, K. Karlsrud, B. Wei, "Characterization of semi-top-down excavation for subway station in Shanghai soft ground," Tunnelling and Underground Space Technology, vol. 68, pp. 244-261, DOI: 10.1016/j.tust.2017.05.028, 2017.
[4] Y. Tan, D. Wang, "Characteristics of a large-scale deep foundation pit excavated by the central-island technique in shanghai soft clay. II: top-down construction of the peripheral rectangular pit," Journal of Geotechnical and Geoenvironmental Engineering, vol. 139 no. 11, pp. 1894-1910, DOI: 10.1061/(asce)gt.1943-5606.0000929, 2013.
[5] X. B. Ji, P. P. Ni, W. Zhao, H. F. Yu, "Top-down excavation of an underpass linking two large-scale basements in sandy soil," Arabian Journal of Geosciences, vol. 12 no. 10, pp. 101-111, DOI: 10.1007/s12517-019-4493-y, 2019.
[6] Y. H. Park, J. P. Kim, K. H. Cho, "Stability analysis of subway box structure supported by modified underpinning method," Tunnelling and Underground Space Technology, vol. 50, pp. 199-208, DOI: 10.1016/j.tust.2015.06.013, 2015.
[7] S. B. Erin, S. Masoud, B. Brain, S. Jesse, B. Adam, "Nondestructive testing for design verification of Boston’s Central Artery underpinning frames and connections," Bridge Structures, vol. 4 no. 1, pp. 87-98, 2008.
[8] A. Pinto, A. Pereira, "Retaining structures and underpinning solutions at the deep excavations for the Porto Bay Hotel," Proceedings of the Lisbon,” Geotechnical Engineering for Infrastructure and Development-Proceedings of the XVI European Conference on Soil Mechanics and Geotechnical Engineering, ECSMGE 2015, vol. 3, pp. 979-984, .
[9] Y. C. Tan, W. S. Teh, C. Y. Gue, "Special design considerations for underpinning systems of existing structures due to tunneling," Proceedings of the Tunnels and Underground Cities: Engineering and Innovation meet Archaeology, Architecture and Art-Proceedings of the WTC 2019 ITA-AITES World Tunnel Congress, pp. 6258-6267, DOI: 10.1201/9780429424441-662, .
[10] V. Kalpakcı, Ş. Öztürk, H. Burak Ekmen, H. Murat Algın, A. Burak Ekmen, "3D settlement analysis of underpinning piles under raft foundation subjected to nonuniform vertical loading," Proceedings of the China-Europe Conference on Geotechnical Engineering, pp. 973-977, DOI: 10.1007/978-3-319-97115-5_19, .
[11] C. C. Wang, Y. E. Jang, S. J. Kim, J. T. Han, "Effect of waveform mircopile on foundation underpinning during building remodeling with vertical extension," Proceedings of the Civil Infrastructures Confronting Severe Weathers and Climate Changes Conference, pp. 120-131, DOI: 10.1007/978-3-319-95753-1_10, .
[12] M. Shen, Y. W. Li, C. Z. Hu, S. Xue, C. Y. Xiang, J. Luo, Y. Yu, "The interfacial structure underpinning the Al-Ga liquid metal embrittlement: disorder vs. order gradients," Scripta Materialia, vol. 204, pp. 114-149, DOI: 10.1016/j.scriptamat.2021.114149, 2021.
[13] A. O. Adekunte, D. Hilton, D. Greentree, "An alternative approach for estimating the vertical capacity of l-shaped segmental underpinning systems in urban basement construction," Proceedings of the Deep Foundations Institute Annual Conference on Deep Foundations, pp. 139-156, .
[14] H. Reider, "Underpinning a twelve-storey office building in Vienna," Bautechnik, vol. 66 no. 8, pp. 253-260, 1989.
[15] Y. W. Wen, M. L. Hu, S. Y. Han, S. Y. Liu, "Application of static bolt-pile technique to construction of basement of existing buildings," Chinese Journal of Geotechnical Engineering, vol. 35 no. S2, pp. 224-229, 2013.
[16] X. S. Cheng, J. L. Hong, D. Li, "Simplified timoshenko method for pile underpinning reinforcement of existing self-bearing brick masonry walls," Journal of Building Engineering, vol. 35, pp. 102-113, DOI: 10.1016/j.jobe.2020.102062, 2021.
[17] Y. Mochida, Y. Matsumoto, "A study on the vertical displacement of the underpinning building during construction process of seismic isolation retrofit," Journal of Structural and Construction Engineering (Transactions of AIJ), vol. 68 no. 572, pp. 17-24, DOI: 10.3130/aijs.68.17_2, 2003.
[18] R Van, J Daniel, R. B Dill, "Design and construction of a multiple-drift subway underpinning structure for Boston’s Central Artery/Tunnel project," Proceedings of the-Rapid Excavation and Tunneling Conference, pp. 187-198, .
[19] Q. Jia, F. Gu, "Numerical analysis on settlement law of an underpinning structure composed of piles and beams," Advanced Materials Research, vol. 163-167, pp. 3654-3661, 2011.
[20] S. Yang, B. Leshchinsky, K. Cui, F. Zhang, Y. Gao, "Influence of failure mechanism on seismic bearing capacity factors for shallow foundations near slopes," Géotechnique, vol. 71 no. 7, pp. 594-607, DOI: 10.1680/jgeot.19.p.329, 2021.
[21] S. C. Yang, B. Leshchinsky, K. Cui, F. Zhang, Y. F. Gao, "Unified approach toward evaluating bearing capacity of shallow foundations near slopes," Journal of Geotechnical and Geoenvironmental Engineering, vol. 145 no. 12,DOI: 10.1061/(asce)gt.1943-5606.0002178, 2019.
[22] A. M. Y. Mohammed, K. Maekawa, "Global and local impacts of soil confinement on RC pile nonlinearity," Journal of Advanced Concrete Technology, vol. 10 no. 11, pp. 375-388, DOI: 10.3151/jact.10.375, 2012.
[23] Y. Kimura, K. Tokimatsu, "Buckling stress of slender piles with rotational restraint at the pile head in liquefied soil," Journal of Structural and Construction Engineering, vol. 74 no. 4, pp. 721-729, DOI: 10.3130/aijs.74.721, 2009.
[24] S. Catal, H. H. Catal, "Buckling analysis of partially embedded pile in elastic soil using differential transform method," Structural Engineering & Mechanics, vol. 24 no. 2, pp. 247-268, DOI: 10.12989/sem.2006.24.2.247, 2006.
[25] T. Mase, S. Nakai, "Examination of soil spring setting method of single pile," Journal of Structural and Construction Engineering (Transactions of AIJ), vol. 77 no. 680, pp. 1527-1535, DOI: 10.3130/aijs.77.1527, 2012.
[26] S. Shimomura, Y. Suzuki, "Horizontal resistance of pile evaluated by chang’s formula using coefficient of subgrade reaction calculated from shear wave velocity," Journal of Structural and Construction Engineering (Transactions of AIJ), vol. 82 no. 741, pp. 1747-1757, DOI: 10.3130/aijs.82.1747, 2017.
[27] H. W. Ying, X. G. Wang, Y. Guo, Y. Y. Hu, X. L. Yang, "Three-dimensional m method for retaining structures and its application for top-down construction of excavations," Chinese Journal of Geotechnical Engineering, vol. 41 no. 1, pp. 37-40, 2019.
[28] DB33/T 1112-2015, Technical Specification for Building Foundation Excavation Engineering Constructed by Top-Down Method, 2015.
[29] Jgj 94-2008, Technical Code for Building Pile Foundation, 2008.
You have requested "on-the-fly" machine translation of selected content from our databases. This functionality is provided solely for your convenience and is in no way intended to replace human translation. Show full disclaimer
Neither ProQuest nor its licensors make any representations or warranties with respect to the translations. The translations are automatically generated "AS IS" and "AS AVAILABLE" and are not retained in our systems. PROQUEST AND ITS LICENSORS SPECIFICALLY DISCLAIM ANY AND ALL EXPRESS OR IMPLIED WARRANTIES, INCLUDING WITHOUT LIMITATION, ANY WARRANTIES FOR AVAILABILITY, ACCURACY, TIMELINESS, COMPLETENESS, NON-INFRINGMENT, MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE. Your use of the translations is subject to all use restrictions contained in your Electronic Products License Agreement and by using the translation functionality you agree to forgo any and all claims against ProQuest or its licensors for your use of the translation functionality and any output derived there from. Hide full disclaimer
Copyright © 2022 Zhen Wang et al. This is an open access article distributed under the Creative Commons Attribution License (the “License”), which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited. Notwithstanding the ProQuest Terms and Conditions, you may use this content in accordance with the terms of the License. https://creativecommons.org/licenses/by/4.0/
Abstract
The bearing capacity of the vertical underpinning structure system is the key index in the design of top-down construction for adding a basement layer under existing buildings. The influence of the lateral restraint is the most significant under the dynamic construction excavation. For the problem of the bearing capacity of the existing engineering pile group under the top-down construction, the linear eigenvalue stability method was used first to study the influence of the lateral restraints such as the horizontal resistance of soil, the diameter of piles body, and the bending rigidity of the temporary steel bracing on its bearing capacity. The corresponding critical stability load and the effective length coefficient were then obtained. Then, based on the nonlinear extreme point stability method with the initial geometrical imperfection, the amplification range for the effective length coefficient was studied. Finally, based on the current Chinese Code Formula (JGJ 94-2008) and considering the influence of the compression buckling effect of the high cap pile, the present solution of the bearing capacity for the pile body was obtained and compared with the code solution. It turns out that the nonlinear bearing capacity of existing engineering piles group with initial imperfection is smaller than the critical stability load of the linear eigenvalue and increases with the increase of the imperfection amplitude, and the amplification range of the effective length coefficient is 1.10∼1.20. The present solution of the bearing capacity with the compression buckling effect is 1.10∼1.30 times of the code solution, which shows that the code solution is partial to safety, and the residual bearing can be properly considered in the design.
You have requested "on-the-fly" machine translation of selected content from our databases. This functionality is provided solely for your convenience and is in no way intended to replace human translation. Show full disclaimer
Neither ProQuest nor its licensors make any representations or warranties with respect to the translations. The translations are automatically generated "AS IS" and "AS AVAILABLE" and are not retained in our systems. PROQUEST AND ITS LICENSORS SPECIFICALLY DISCLAIM ANY AND ALL EXPRESS OR IMPLIED WARRANTIES, INCLUDING WITHOUT LIMITATION, ANY WARRANTIES FOR AVAILABILITY, ACCURACY, TIMELINESS, COMPLETENESS, NON-INFRINGMENT, MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE. Your use of the translations is subject to all use restrictions contained in your Electronic Products License Agreement and by using the translation functionality you agree to forgo any and all claims against ProQuest or its licensors for your use of the translation functionality and any output derived there from. Hide full disclaimer
Details

1 Department of Civil Engineering, Zhejiang University City College, Hangzhou 310015, China; Key Laboratory of Safe Construction and Intelligent Maintenance for Urban Shield Tunnels of Zhejiang Province, Hangzhou 310015, China; Zhejiang Province Institute of Architectural Design and Research, Hangzhou 310006, China
2 Department of Civil Engineering, Zhejiang University City College, Hangzhou 310015, China; College of Civil Engineering and Architecture, Zhejiang University, Hangzhou 310058, China
3 Zhejiang Province Institute of Architectural Design and Research, Hangzhou 310006, China
4 Department of Civil Engineering, Zhejiang University City College, Hangzhou 310015, China; Key Laboratory of Safe Construction and Intelligent Maintenance for Urban Shield Tunnels of Zhejiang Province, Hangzhou 310015, China
5 Senkee Special Construction Engineering Co., Ltd., Hangzhou 310007, China