Abstract

Many risks have adverse consequences for construction projects’ objectives such as quality, schedule, and cost. As engineering procurement construction (EPC) contracts gradually become one of the most common types used in implementing major large-scale construction projects, identifying common risk types and analyzing their root causes is important for developing measures to decrease and eliminate future risks in these types of contracts. The information about the main causes of risks was collected via well-structured questionnaires addressed to construction sector professionals and preparing lists of main potential risks in EPC/construction projects through reviewing literature studies, books, and articles related to this topic. The findings indicate that several causes of risks are more critical for the project including causes related to contract, design and execution, subcontractors, systems, and equipment. The study’s results revealed that the absence of risk management implementation in the EPC construction project is a root cause of the lack of planning and control of the project.

Details

Title
Identification of the main causes of risks in engineering procurement construction projects
Author
Noor Hussein Khairullah 1 ; Mustafa Abdullah Hilal 1 ; Abbas, Mohammed 1 

 Civil Engineering Department, University of Baghdad, Baghdad, Iraq 
Pages
282-289
Publication year
2022
Publication date
2022
Publisher
Walter de Gruyter GmbH
ISSN
03348938
e-ISSN
21910243
Source type
Scholarly Journal
Language of publication
English
ProQuest document ID
2674053891
Copyright
© 2022. This work is published under http://creativecommons.org/licenses/by/4.0 (the “License”). Notwithstanding the ProQuest Terms and Conditions, you may use this content in accordance with the terms of the License.