Full Text

Turn on search term navigation

© 2022 by the authors. Licensee MDPI, Basel, Switzerland. This article is an open access article distributed under the terms and conditions of the Creative Commons Attribution (CC BY) license (https://creativecommons.org/licenses/by/4.0/). Notwithstanding the ProQuest Terms and Conditions, you may use this content in accordance with the terms of the License.

Abstract

When the tunnel boring machine (TBM) construction method is used to build tunnels, if the type of TBM is not appropriate, problems, such as low construction efficiency and increased construction cost, will easily occur. Therefore, it is necessary to build a TBM selection decision-making model to guide TBM selection. In this paper, seven evaluation indexes are selected according to engineering experience and expert suggestions, and the quantitative standards of each index are unified. The modified analytic hierarchy process (MAHP) method is used to determine the weight of each evaluation index. The technique for order preference by similarity to an ideal solution (TOPSIS) method is adopted as the decision-making method of TBM selection. Finally, a TBM selection decision-making model is proposed based on the above methods. In order to verify the reliability of the TBM selection decision-making model proposed in this paper, we selected three projects for case verification and compared them with the previous TBM selection methods. The results show that the decision-making results of the method proposed in this paper are good. Additionally, the method proposed in this paper is more comprehensive and accurate than the previous methods. The model proposed in this paper can provide better suggestions for TBM selection in the project planning stage.

Details

Title
Research on the Tunnel Boring Machine Selection Decision-Making Model Based on the Fuzzy Evaluation Method
Author
Tan, Zhongsheng 1 ; Lai, Haixiang 1   VIAFID ORCID Logo  ; Li, Zonglin 1   VIAFID ORCID Logo  ; Zhou, Zhenliang 1   VIAFID ORCID Logo  ; Jiao, Yifeng 2 ; Li, Fengyuan 3 ; Wang, Liming 3 

 Key Laboratory for Urban Underground Engineering of Ministry of Education, Beijing Jiaotong University, Beijing 100044, China; School of Civil Engineering, Beijing Jiaotong University, Beijing 100044, China 
 Xinjiang Erqis River Investment Development (Group) Co., Ltd., Urumqi 830002, China 
 State Key Laboratory of Shield Machine and Boring Technology, Zhengzhou 450001, China 
First page
10802
Publication year
2022
Publication date
2022
Publisher
MDPI AG
e-ISSN
20763417
Source type
Scholarly Journal
Language of publication
English
ProQuest document ID
2771650956
Copyright
© 2022 by the authors. Licensee MDPI, Basel, Switzerland. This article is an open access article distributed under the terms and conditions of the Creative Commons Attribution (CC BY) license (https://creativecommons.org/licenses/by/4.0/). Notwithstanding the ProQuest Terms and Conditions, you may use this content in accordance with the terms of the License.