It appears you don't have support to open PDFs in this web browser. To view this file, Open with your PDF reader
Abstract
The power quality and efficiency of the hydro-power station depend on the stable operation of the hydro-generator unit, which needs to continue to operate and it is prone to axis failure. Therefore, to adopt effective axis adjustment technology to eliminate faults. This paper proposes a new method for axis adjustment of hydro-generator unit based on an improved grey prediction model and swarms intelligence optimization neural network. First of all, it proposes a sequence acceleration translation and mean value transformation method, which is used to pre-process the axis net total swing sequence that exhibits oscillating fluctuations. It uses e1 and e2 factor transformation to establish an improved axis net total swing gray prediction model. Then, the advanced flamingo search algorithm is used to search the maximum value of the sine function of the net total pendulum of the axis, and the axis adjustment orientation is obtained. This method solves the problem that GM(1, 1) can only be predicted by monotone sequence in the past and the problem that the search algorithm is easy to fall into local optimum, effectively improves the calculation efficiency of axis and shorts the search time. Simulation examples show that the proposed method can significantly improve accuracy of axis adjustment. This method greatly improves the efficiency of azimuth search for axis adjustment.
You have requested "on-the-fly" machine translation of selected content from our databases. This functionality is provided solely for your convenience and is in no way intended to replace human translation. Show full disclaimer
Neither ProQuest nor its licensors make any representations or warranties with respect to the translations. The translations are automatically generated "AS IS" and "AS AVAILABLE" and are not retained in our systems. PROQUEST AND ITS LICENSORS SPECIFICALLY DISCLAIM ANY AND ALL EXPRESS OR IMPLIED WARRANTIES, INCLUDING WITHOUT LIMITATION, ANY WARRANTIES FOR AVAILABILITY, ACCURACY, TIMELINESS, COMPLETENESS, NON-INFRINGMENT, MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE. Your use of the translations is subject to all use restrictions contained in your Electronic Products License Agreement and by using the translation functionality you agree to forgo any and all claims against ProQuest or its licensors for your use of the translation functionality and any output derived there from. Hide full disclaimer
Details
1 Northeast Electric Power University, School of Computer Science, Jilin, China (GRID:grid.412245.4) (ISNI:0000 0004 1760 0539); Guangdong ATV Academy for Performing Arts, Dongguan, China (GRID:grid.412245.4)
2 Northeast Electric Power University, School of Computer Science, Jilin, China (GRID:grid.412245.4) (ISNI:0000 0004 1760 0539)
3 Northeast Electric Power University, School of Electrical Engineering, Jilin, China (GRID:grid.412245.4) (ISNI:0000 0004 1760 0539)
4 State Grid Jilin Electric Power Co., Ltd., Changchun, China (GRID:grid.412245.4)