Full text

Turn on search term navigation

© 2023 by the authors. Licensee MDPI, Basel, Switzerland. This article is an open access article distributed under the terms and conditions of the Creative Commons Attribution (CC BY) license (https://creativecommons.org/licenses/by/4.0/). Notwithstanding the ProQuest Terms and Conditions, you may use this content in accordance with the terms of the License.

Abstract

The stable operation of a variable frequency pump is of great importance to the management of a water supply project. Analyzing the operation performance based on monitoring data is necessary for maintaining the stable operation of a variable frequency pump. Several sensors are installed at six monitoring points on the pump to collect signals including vibration velocity, vibration acceleration and vibration displacement. Monitoring signals are preprocessed by smoothing, adjusting waveform trend and filtering on the basis of Fast Fourier Transform (FFT). Then, the vibration features are extracted by power spectrum analysis and cepstrum analysis methods. According to the extracted features, the vibration law and actual operation performance of a variable frequency pump under different operating conditions are analyzed. Results indicate that the vibration amplitude of the pump varies sharply under the operating conditions of [15 Hz, 20 Hz] and [30 Hz, 35 Hz]. The operating condition of [0 Hz, 15 Hz] is the restricted operating area of the pump. The vibration and noise continue increasing under the operating conditions of [35 Hz, 50 Hz] and reach the maximum values at 50 Hz. Therefore, the optimal operating is within the range of [20 Hz, 30 Hz]. Finally, by analyzing the critical values of the operating conditions, the fault diagnosis and the evaluation of the operating status are conducted.

Details

Title
Monitoring and Analysis of the Operation Performance of Vertical Centrifugal Variable Frequency Pump in Water Supply System
Author
Hu, Jianyong 1   VIAFID ORCID Logo  ; Wang, Chaohao 2 ; Shan, Chengju 3 ; Guo, Yunhui 4 

 School of Geomatics and Municipal Engineering, Zhejiang University of Water Resources and Electric Power, Hangzhou 310018, China; [email protected]; Engineering Research Center of Digital Twin Basin of Zhejiang Province, Hangzhou 310018, China; [email protected] 
 Guangdong Provincial Design Institute of Water Conservancy and Electric Power, Guangzhou 510635, China; [email protected] 
 Engineering Research Center of Digital Twin Basin of Zhejiang Province, Hangzhou 310018, China; [email protected]; School of Water Conservancy and Environmental Engineering, Zhejiang University of Water Resources and Electric Power, Hangzhou 310018, China 
 School of Geomatics and Municipal Engineering, Zhejiang University of Water Resources and Electric Power, Hangzhou 310018, China; [email protected]; Engineering Research Center of Digital Twin Basin of Zhejiang Province, Hangzhou 310018, China; [email protected]; School of Electric Power, North China University of Water Resources and Electric Power, Zhengzhou 450045, China 
First page
4526
Publication year
2023
Publication date
2023
Publisher
MDPI AG
e-ISSN
19961073
Source type
Scholarly Journal
Language of publication
English
ProQuest document ID
2823995061
Copyright
© 2023 by the authors. Licensee MDPI, Basel, Switzerland. This article is an open access article distributed under the terms and conditions of the Creative Commons Attribution (CC BY) license (https://creativecommons.org/licenses/by/4.0/). Notwithstanding the ProQuest Terms and Conditions, you may use this content in accordance with the terms of the License.