Full Text

Turn on search term navigation

© 2024 by the authors. Licensee MDPI, Basel, Switzerland. This article is an open access article distributed under the terms and conditions of the Creative Commons Attribution (CC BY) license (https://creativecommons.org/licenses/by/4.0/). Notwithstanding the ProQuest Terms and Conditions, you may use this content in accordance with the terms of the License.

Abstract

The main purpose of this study is to quantify and compare the embodied carbon (EC) from the materials used or designed to build the Adohi Hall, a residence building located on the University of Arkansas campus in Fayetteville, AR. It has been constructed as a mass timber structure. It is compared to the same building design with a steel frame for this study. Based on the defined goal and scope of the project, all materials used in the building structure are compared for their global warming potential (GWP) impact by applying a life cycle assessment (LCA) using a cradle-to-construction site system boundary. This comparative building LCA comprises the product stage (including raw material extraction, processing, transporting, and manufacturing) plus transportation to the construction site (nodule A1–A4, according to standard EN 15804 definitions). In this study, GWP is primarily assessed with the exclusion of other environmental factors. Tally®, as one of the most popular LCA tools for buildings, is used in this comparative LCA analysis. In this study, the substitution of mass timber for a steel structure with a corrugated steel deck and concrete topping offers a promising opportunity to understand the GWP impact of each structure. Mass timber structures exhibit superior environmental attributes considering the carbon dioxide equivalent (CO2 eq). Emissions per square meter of gross floor area for mass timber stand at 198 kg, in stark contrast to the 243 kg CO2 eq recorded for steel structures. This means the mass timber building achieved a 19% reduction in carbon emissions compared to the functional equivalent steel structure within the building modules A1 to A4 studied. When considering carbon storage, about 2757 tonnes of CO2 eq are stored in the mass timber building, presenting further benefits of carbon emission delays for the life span of the structure. The substitution benefit from this construction case was studied through the displacement factor (DF) quantification following the standard process. A 0.28 DF was obtained when using mass timber over steel in the structure. This study provides insights into making more environmentally efficient decisions in buildings and helps in the move forward to reduce greenhouse gas (GHG) emissions and address GWP mitigation.

Details

Title
Comparison of Embodied Carbon Footprint of a Mass Timber Building Structure with a Steel Equivalent
Author
Hemmati, Mahboobeh 1   VIAFID ORCID Logo  ; Messadi, Tahar 2 ; Gu, Hongmei 3   VIAFID ORCID Logo  ; Seddelmeyer, Jacob 2 ; Hemmati, Moein 1   VIAFID ORCID Logo 

 Environmental Dynamics Ph.D. Program, University of Arkansas, Fayetteville, AR 72701, USA; [email protected] 
 Fay Jones School of Architecture and Design, University of Arkansas, Fayetteville, AR 72701, USA; [email protected] 
 Forest Products Laboratory, USDA Forest Service, Madison, WI 53726, USA; [email protected] 
First page
1276
Publication year
2024
Publication date
2024
Publisher
MDPI AG
e-ISSN
20755309
Source type
Scholarly Journal
Language of publication
English
ProQuest document ID
3059506095
Copyright
© 2024 by the authors. Licensee MDPI, Basel, Switzerland. This article is an open access article distributed under the terms and conditions of the Creative Commons Attribution (CC BY) license (https://creativecommons.org/licenses/by/4.0/). Notwithstanding the ProQuest Terms and Conditions, you may use this content in accordance with the terms of the License.