It appears you don't have support to open PDFs in this web browser. To view this file, Open with your PDF reader
Abstract
Reservoir flood control scheduling is a challenging optimization task, particularly due to the complexity of various constraints. This paper proposes an innovative algorithm design approach to address this challenge. Combining the basic walrus optimization algorithm with the adaptive ε-constraint method and introducing the SPM chaotic mapping for population initialization, spiral search strategy, and local enhancement search strategy based on Cauchy mutation and reverse learning significantly enhances the algorithm's optimization performance. On this basis, innovate an adaptive approach ε A New Algorithm for Constraints and Multi Strategy Optimization Improvement (ε-IWOA). To validate the performance of the ε-IWOA algorithm, 24 constrained optimization test functions are used to test its optimization capabilities and effectiveness in solving constrained optimization problems. Experimental results demonstrate that the ε-IWOA algorithm exhibits excellent optimization ability and stable performance. Taking the Taolinkou Reservoir, Daheiting Reservoir, and Panjiakou Reservoir in the middle and lower reaches of the Luanhe River Basin as a case study, this paper applies the ε-IWOA algorithm to practical reservoir scheduling problems by constructing a three-reservoir flood control scheduling system with Luanxian as the control point. A comparative analysis is conducted with the ε-WOA, ε-DE and ε-PSO (particle swarm optimization) algorithms.The experimental results indicate that ε-IWOA algorithm performs the best in optimization, with the occupied flood control capacity of the three reservoirs reaching 89.32%, 90.02%, and 80.95%, respectively. The control points in Luan County can reduce the peak by 49%.This provides a practical and effective solution method for reservoir optimization scheduling models. This study offers new ideas and solutions for flood control optimization scheduling of reservoir groups, contributing to the optimization and development of reservoir scheduling work.
You have requested "on-the-fly" machine translation of selected content from our databases. This functionality is provided solely for your convenience and is in no way intended to replace human translation. Show full disclaimer
Neither ProQuest nor its licensors make any representations or warranties with respect to the translations. The translations are automatically generated "AS IS" and "AS AVAILABLE" and are not retained in our systems. PROQUEST AND ITS LICENSORS SPECIFICALLY DISCLAIM ANY AND ALL EXPRESS OR IMPLIED WARRANTIES, INCLUDING WITHOUT LIMITATION, ANY WARRANTIES FOR AVAILABILITY, ACCURACY, TIMELINESS, COMPLETENESS, NON-INFRINGMENT, MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE. Your use of the translations is subject to all use restrictions contained in your Electronic Products License Agreement and by using the translation functionality you agree to forgo any and all claims against ProQuest or its licensors for your use of the translation functionality and any output derived there from. Hide full disclaimer
Details
1 North China University of Water Resources and Electric Power, College of Water Resources, Henan Key Laboratory of Water Resources Conservation and Intensive Utilization in the Yellow River Basin, Zhengzhou, China (GRID:grid.412224.3) (ISNI:0000 0004 1759 6955)