Content area

Abstract

Purpose: This paper investigates a batch scheduling problem where pre-processing is required for parts before processing, considering time-changing effects from part deterioration and operator learning-forgetting.

Design/methodology/approach: A mathematical model was developed with the decision variables of the number of batches, the number of pre-processings, batch sizes, and the schedule of processes and pre-processings to minimize total actual flow time. Different numbers of batches were gradually tried and increased until the objective function stopped improving. The minimum number of pre-processings that resulted in a feasible solution was examined at each number of batches.

Findings:Our experiment showed that: (1) A faster operator learning led to a lower optimal number of batches and a lower total actual flow time, (2) A faster part deterioration brought a higher number of batches and a higher total actual flow time, (3) The model minimized the number of pre-processings by only scheduling pre-processings before the operations at machine 1, and (4) The model divided the parts into small batches to prevent increased processing time due to part deterioration.

Research limitations: The research did not consider multi-due date and multi-item system which require pre-processings with different times and capacities.

Practical implications: Production managers should assign fast learning operators to shorter batches and faster deteriorating parts.

Originality/value: This research was the first to consider pre-processing in batch scheduling.

Details

1009240
Title
A flow shop batch scheduling model with pre-processing and time-changing effects to minimize total actual flow time
Volume
17
Issue
2
Pages
542-561
Publication year
2024
Publication date
2024
Section
Articles
Publisher
Vicenc Fernandez
Place of publication
Barcelona
Country of publication
Spain
ISSN
20138423
e-ISSN
20130953
Source type
Scholarly Journal
Language of publication
English
Document type
Journal Article
Publication history
 
 
Milestone dates
2024-06-28 (Created); 2023-12-20 (Submitted); 2024-05-13 (Issued); 2024-06-28 (Modified)
ProQuest document ID
3085231130
Document URL
https://www.proquest.com/scholarly-journals/flow-shop-batch-scheduling-model-with-pre/docview/3085231130/se-2?accountid=208611
Copyright
© 2024. This work is published under https://creativecommons.org/licenses/by-nc/4.0 (the “License”). Notwithstanding the ProQuest Terms and Conditions, you may use this content in accordance with the terms of the License.
Last updated
2024-08-05
Database
ProQuest One Academic