Full text

Turn on search term navigation

© 2024 by the authors. Licensee MDPI, Basel, Switzerland. This article is an open access article distributed under the terms and conditions of the Creative Commons Attribution (CC BY) license (https://creativecommons.org/licenses/by/4.0/). Notwithstanding the ProQuest Terms and Conditions, you may use this content in accordance with the terms of the License.

Abstract

Refracturing is an important technology for tapping remaining oil and gas areas and enhancing recovery in old oilfields. However, a complete and detailed refracturing timing optimization scheme has not yet been proposed. In this paper, based on the finite volume method and the embedded discrete fracture model, a new coupled fluid flow/geomechanics pore-elastic-fractured reservoir model is developed. The COMSOL 3.5 commercial software was used to verify the accuracy of our model, and by studying the influence of matrix permeability, initial stress difference, cluster spacing, and fracture half-length on the orientation of maximum horizontal stress, a timing optimization method for refracturing is proposed. The results of this paper show that the principle of optimizing the refracturing timing is to avoid the time window where the percentage of Type I (Type I indicates that stress inversion has occurred, 0α20; Type II indicates that the turning degree is strong, 20<α70; and Type III indicates less stress reorientation, 70<α90) stress reorientation area is relatively large, so that the fractures can extend perpendicular to the horizontal wellbore. At the same time, the simulation results show that with the increase in production time, the percentage of Type I and Type II increases first and then decreases, while the percentage of Type III decreases first and then increases. When the reservoir permeability, stress difference, and cluster spacing are larger, the two types of refracturing measures can be implemented earlier. But, with the increase in fracture half-length, the timing of refracturing Method I is earlier, and the timing of refracturing Method II is later. The research results of this paper are of great significance to the perfection of the refracturing theory and the optimization of refracturing design.

Details

Title
Refracturing Time Optimization Considering the Effect of Induced Stress by Pressure Depletion in the Shale Reservoir
Author
Zeng, Bo 1 ; Song, Yi 1 ; Hu, Yongquan 2 ; Wang, Qiang 2 ; Du, Yurou 1 ; Tang, Dengji 1 ; Chen, Ke 1 ; Dong, Yan 1 

 Shale Gas Research Institute, PetroChina Southwest Oil & Gasfield Company, Chengdu 610051, China; [email protected] (B.Z.); [email protected] (Y.S.); [email protected] (Y.D.); [email protected] (D.T.); [email protected] (K.C.); [email protected] (Y.D.) 
 State Key Laboratory of Oil-Gas Reservoir Geology & Exploitation, Southwest Petroleum University, Chengdu 610500, China; [email protected] 
First page
2365
Publication year
2024
Publication date
2024
Publisher
MDPI AG
e-ISSN
22279717
Source type
Scholarly Journal
Language of publication
English
ProQuest document ID
3133379439
Copyright
© 2024 by the authors. Licensee MDPI, Basel, Switzerland. This article is an open access article distributed under the terms and conditions of the Creative Commons Attribution (CC BY) license (https://creativecommons.org/licenses/by/4.0/). Notwithstanding the ProQuest Terms and Conditions, you may use this content in accordance with the terms of the License.