Full text

Turn on search term navigation

© 2024 by the authors. Licensee MDPI, Basel, Switzerland. This article is an open access article distributed under the terms and conditions of the Creative Commons Attribution (CC BY) license (https://creativecommons.org/licenses/by/4.0/). Notwithstanding the ProQuest Terms and Conditions, you may use this content in accordance with the terms of the License.

Abstract

Cutterhead torque is a key operational parameter for earth pressure balance (EPB) TBM tunneling in soil strata. The effective management of cutterhead torque can significantly maintain face stability and ensure the tunneling machine operates steadily. The Shenzhen Metro Line 12 project at Shasan Station utilized the world’s largest rectangular pipe jacking machine for constructing the subway station. This project has enabled the collection of relevant data to analyze the factors influencing cutterhead torque and to establish a predictive model. The data encompass an abundant array of cutterhead design parameters, operational parameters, properties of the excavated soil, and environmental factors, revealing the distribution characteristics of cutterhead torque during tunneling. The correlation between various factors and cutterhead torque has been examined. By employing multiple regression analysis and a Levenberg–Marquardt (L-M) algorithm-based neural network, an optimal prediction model for EPB cutterhead torque has been developed. This prediction model incorporates various factors, including cutterhead diameter, RPM, soil chamber pressure, soil shear strength, and the soil consistency index. And the degree of influence of each factor on the cutter torque was also revealed. The prediction results demonstrated good accuracy compared to previous models, providing valuable insights and guidance for EPB TBMs or pipe jacking machines operating in soil strata. The current limitations of this model and suggestions for future work have also been addressed.

Details

Title
A New Prediction Model of Cutterhead Torque in Soil Strata Based on Ultra-Large Section EPB Pipe Jacking Machine
Author
Lu, Jianwei 1 ; Sun, Bo 2 ; Gong, Qiuming 3 ; Song, Tiantian 2 ; Li, Wei 2   VIAFID ORCID Logo  ; Zhou, Wenpeng 4 ; Yang, Li 5 

 Shenzhen Metro Group Co., Ltd., Shenzhen 518038, China; [email protected] (J.L.); [email protected] (B.S.); [email protected] (T.S.); Key Laboratory of Urban Security and Disaster Engineering of Ministry of Education, Beijing University of Technology, Beijing 100124, China 
 Shenzhen Metro Group Co., Ltd., Shenzhen 518038, China; [email protected] (J.L.); [email protected] (B.S.); [email protected] (T.S.) 
 Key Laboratory of Urban Security and Disaster Engineering of Ministry of Education, Beijing University of Technology, Beijing 100124, China 
 China Water Resources and Hydropower Eleventh Engineering Bureau Co., Ltd., Zhenzhou 450001, China; [email protected] 
 China Railway Engineering Equipment Group Co., Ltd., Zhenzhou 450047, China; [email protected] 
First page
212
Publication year
2024
Publication date
2024
Publisher
MDPI AG
e-ISSN
24123811
Source type
Scholarly Journal
Language of publication
English
ProQuest document ID
3149643436
Copyright
© 2024 by the authors. Licensee MDPI, Basel, Switzerland. This article is an open access article distributed under the terms and conditions of the Creative Commons Attribution (CC BY) license (https://creativecommons.org/licenses/by/4.0/). Notwithstanding the ProQuest Terms and Conditions, you may use this content in accordance with the terms of the License.