Content area
Segment assembly is one of the principal processes during tunnel construction using a tunnel boring machine (TBM). The segment erector is a robotic manipulator powered by a hydraulic system that assembles prefabricated concrete segments onto the excavated tunnel surface. In the case of a larger diameter, while the segment assembly has a more extensive range of motion, it also demands more control accuracy. However, the single-pump-based hydraulic system fails to meet the dual requirements. Therefore, this paper proposes a novel dual parallel-connected-pump hydraulic system consisting of a small displacement pump and a large displacement pump. On this basis, taking advantage of both the quick response and low dead zone of the small pump and the high flow range of the large pump, a two-level error allocation strategy is constructed to coordinate the two pumps and keep the motion error of segment assembly within a small range. Finally, comparative experiments were conducted, and the results show that the proposed scheme achieves the simultaneous high-level synchronization of the two pumps and high-precision and high-speed motion-tracking performance.
Details
1 China Railway Engineering Equipment Group Co., Ltd., Zhengzhou 450016, China;
2 School of Mechanical Engineering, Zhejiang University, Hangzhou 310027, China;