Abstract
At present, the deployment of obstacle avoidance nodes of overhead transmission lines in the airport clearance protection area is generally set in a decentralized manner, and the coverage of obstacle avoidance is limited, which leads to the difficulty of the final optimization results of obstacle avoidance to meet the expected standards, and the cost of obstacle avoidance increases. Therefore, the design and analysis of the optimization method for obstacle avoidance of overhead transmission lines in the airport clearance protection area based on the GSA algorithm are proposed. According to the current optimization requirements, the multi-step method is adopted first to break the limit of obstacle avoidance coverage and complete the multi-step deployment of obstacle avoidance recognition nodes and obstacle feature collection. Based on this, the GSA calculation optimization model for obstacle avoidance of overhead transmission lines in the airport clearance protection area is constructed, and the adaptive navigation path planning correction method is used to optimize obstacle avoidance. The test results show that compared with the deployment method of high-voltage transmission lines and the obstacle avoidance optimization of typical cross-coupled transmission lines in the improved YOLOv5, the GSA algorithm in this design finally obtains fewer obstacle avoidance costs for overhead transmission lines in the airport clearance protection area, which indicates that the cost of obstacle avoidance processing has been effectively controlled with the help and support of the GSA algorithm. The specific effect has also been verified in practice.
You have requested "on-the-fly" machine translation of selected content from our databases. This functionality is provided solely for your convenience and is in no way intended to replace human translation. Show full disclaimer
Neither ProQuest nor its licensors make any representations or warranties with respect to the translations. The translations are automatically generated "AS IS" and "AS AVAILABLE" and are not retained in our systems. PROQUEST AND ITS LICENSORS SPECIFICALLY DISCLAIM ANY AND ALL EXPRESS OR IMPLIED WARRANTIES, INCLUDING WITHOUT LIMITATION, ANY WARRANTIES FOR AVAILABILITY, ACCURACY, TIMELINESS, COMPLETENESS, NON-INFRINGMENT, MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE. Your use of the translations is subject to all use restrictions contained in your Electronic Products License Agreement and by using the translation functionality you agree to forgo any and all claims against ProQuest or its licensors for your use of the translation functionality and any output derived there from. Hide full disclaimer
Details
1 State Grid Xinjiang Electric Power Co., Ltd , Urumqi 830000, China
2 CAST Zhongyu (Beijing) New Technology Development Co., LTD , Beijing 100028, China