Content area

Abstract

Currently, there are difficulties in dealing with higher construction requirements and standards in subway construction management. Therefore, a multi-objective optimization model was constructed based on building information management technology, and an improved non-dominated sorting genetic algorithm III was introduced to optimize the model solution. And experimental verification was conducted. These experiments confirmed that the average HV of the improved algorithm was 0.67, which was higher than the original algorithm’s 0.65, indicating that it had higher convergence and reliability. The solution results of the non-dominated sorting genetic algorithm II showed that the optimized cost was 185.1899 million yuan. The cost of optimizing the original non-dominated sorting genetic algorithm III was 184.6469 million yuan. The total cost of optimizing the research algorithm was 184.1165 million yuan. In addition, the research algorithm had the shortest construction period, ideal cost, and significantly higher quality and safety levels than the comparison algorithms. And its time consumption was only 20 seconds, significantly lower than the comparison algorithms. And its cost was between 183 million to 187.5 million yuan, with higher stability and relatively concentrated distribution of solutions. Overall, the subway construction optimization model based on building information management and non-dominated sorting genetic algorithm III has high effectiveness and can be effectively applied in practical construction management.

Details

1009240
Title
The optimization model of building construction based on BIM and improved NSGA-III algorithm
Author
Publication title
Volume
71
Issue
2
Pages
5-18
Publication year
2025
Publication date
2025
Publisher
De Gruyter Brill Sp. z o.o., Paradigm Publishing Services
Place of publication
Warsaw
Country of publication
Poland
Publication subject
ISSN
12302945
e-ISSN
23003103
Source type
Scholarly Journal
Language of publication
English
Document type
Journal Article
Publication history
 
 
Online publication date
2025-06-16
Publication history
 
 
   First posting date
16 Jun 2025
ProQuest document ID
3223303223
Document URL
https://www.proquest.com/scholarly-journals/optimization-model-building-construction-based-on/docview/3223303223/se-2?accountid=208611
Copyright
© 2025. This work is licensed under https://creativecommons.org/licenses/by-sa/4.0/ (the “License”). Notwithstanding the ProQuest Terms and Conditions, you may use this content in accordance with the terms of the License.
Last updated
2025-10-06
Database
2 databases
  • ProQuest One Academic
  • ProQuest One Academic