Content area

Abstract

For a no-wait flow shop with continuous-flow characteristics, this study simultaneously considers machine setup times and rated processing speed constraints, aiming to minimize the sum of the maximum completion time and the maximum tardiness. First, lower bounds for the maximum completion time, the maximum tardiness, and the total objective function are developed. Second, a mixed-integer programming (MIP) model is formulated for the problem, and nonlinear elements are subsequently linearized via time discretization. Due to the computational complexity of the problem, two algorithms are proposed: a heuristic algorithm with fixed machine links and greedy rules (HAFG) and a genetic algorithm based on altering machine combinations (GAAM) for solving large-scale instances. The Earliest Due Date (EDD) rule is used as baselines for algorithmic comparison. To better understand the behaviors of the two algorithms, we observe the two components of the objective function separately. The results show that, compared with the EDD rule and GAAM, the HAFG algorithm tends to focus more on optimizing the maximum completion time. The performance of both algorithms is evaluated using their relative deviations from the developed lower bounds and is compared against the EDD rule. Numerical experiments demonstrate that both HAFG and GAAM significantly outperform the EDD rule. In large-scale instances, the HAFG algorithm achieves a gap of about 4%, while GAAM reaches a gap of about 3%, which is very close to the lower bound. In contrast, the EDD rule shows a deviation of about 10%. Combined with a sensitivity analysis on the number of machines, the proposed framework provides meaningful managerial insights for continuous-flow production environments.

Details

1009240
Business indexing term
Title
Optimization of Continuous Flow-Shop Scheduling Considering Due Dates
Author
Zheng Feifeng 1   VIAFID ORCID Logo  ; Zhang Chunyao 1 ; Liu, Ming 2   VIAFID ORCID Logo 

 Glorious Sun School of Business and Management, Donghua University, Shanghai 200051, China 
 School of Economics & Management, Tongji University, Shanghai 200092, China 
Publication title
Algorithms; Basel
Volume
18
Issue
12
First page
788
Number of pages
28
Publication year
2025
Publication date
2025
Publisher
MDPI AG
Place of publication
Basel
Country of publication
Switzerland
Publication subject
e-ISSN
19994893
Source type
Scholarly Journal
Language of publication
English
Document type
Journal Article
Publication history
 
 
Online publication date
2025-12-12
Milestone dates
2025-10-30 (Received); 2025-12-10 (Accepted)
Publication history
 
 
   First posting date
12 Dec 2025
ProQuest document ID
3286249882
Document URL
https://www.proquest.com/scholarly-journals/optimization-continuous-flow-shop-scheduling/docview/3286249882/se-2?accountid=208611
Copyright
© 2025 by the authors. Licensee MDPI, Basel, Switzerland. This article is an open access article distributed under the terms and conditions of the Creative Commons Attribution (CC BY) license (https://creativecommons.org/licenses/by/4.0/). Notwithstanding the ProQuest Terms and Conditions, you may use this content in accordance with the terms of the License.
Last updated
2025-12-24
Database
ProQuest One Academic