Abstract

A single machine predictive scheduling problem is considered. The primary objective is to minimize the total completion times. The predictability of the schedule is measured by the completion time deviations between the predictive schedule and realized schedule. The surrogate measure of predictability is chosen to evaluate the completion time deviations. Both of the primary objective and predictability are optimized. In order to absorb the effects of disruptions, the predictive schedule is generated by inserting idle times. Right-shift rescheduling method is used as the rescheduling strategy. Three methods are designed to construct predictive schedules. The computational experiments show that these algorithms provide high predictability with minor sacrifices in shop performance.

Details

Title
Single Machine Predictive Scheduling Using Inserted Idle Times
Author
Zhu, Hongli; Zhou, Hong
Publication year
2014
Publication date
2014
Publisher
John Wiley & Sons, Inc.
ISSN
1110757X
e-ISSN
16870042
Source type
Scholarly Journal
Language of publication
English
ProQuest document ID
1552809306
Copyright
Copyright © 2014 Hongli Zhu and Hong Zhou. Hongli Zhu et al. This is an open access article distributed under the Creative Commons Attribution License, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.