It appears you don't have support to open PDFs in this web browser. To view this file, Open with your PDF reader
Abstract
Electric power losses are constantly present during the service life of wind farms and must be considered in the calculation of the income arising from selling the produced electricity. It is typical to estimate the electrical losses in the design stage as those occurring when the wind farm operates at rated power, nevertheless, it is necessary to determine a method for checking if the actual losses meet the design requirements during the operation period. In this paper, we prove that the electric losses at rated power should not be considered as a reference level and a simple methodology will be developed to analyse and foresee the actual losses in a set period as a function of the wind resource in such period, defined according to the Weibull distribution, and the characteristics of the wind farm electrical infrastructure. This methodology facilitates a simple way, to determine in the design phase and to check during operation, the actual electricity losses.
You have requested "on-the-fly" machine translation of selected content from our databases. This functionality is provided solely for your convenience and is in no way intended to replace human translation. Show full disclaimer
Neither ProQuest nor its licensors make any representations or warranties with respect to the translations. The translations are automatically generated "AS IS" and "AS AVAILABLE" and are not retained in our systems. PROQUEST AND ITS LICENSORS SPECIFICALLY DISCLAIM ANY AND ALL EXPRESS OR IMPLIED WARRANTIES, INCLUDING WITHOUT LIMITATION, ANY WARRANTIES FOR AVAILABILITY, ACCURACY, TIMELINESS, COMPLETENESS, NON-INFRINGMENT, MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE. Your use of the translations is subject to all use restrictions contained in your Electronic Products License Agreement and by using the translation functionality you agree to forgo any and all claims against ProQuest or its licensors for your use of the translation functionality and any output derived there from. Hide full disclaimer