Jie Yang 1, 2 and Jing Ma 2 and De-xiu Hu 1, 2 and Lu Wang 2 and Ji-na Yin 2 and Jie Ren 1, 3
Academic Editor:Jian-Ming Lu
1, State Key Laboratory Base of Eco-Hydraulic Engineering in Arid Area, Xi'an University of Technology, Xi'an 710048, China
2, Institute of Water Resources and Hydro-Electric Engineering, Xi'an University of Technology, Xi'an 710048, China
3, State Key Laboratory of Simulation and Regulation of Water Cycle in River Basin, China Institute of Water Resources & Hydropower Research, Beijing 100038, China
Received 26 October 2014; Accepted 21 March 2015; 11 October 2015
This is an open access article distributed under the Creative Commons Attribution License, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
1. Introduction
Sediment deposition and the balance problems [1, 2] of silt erosion and deposition are bound to be faced in the development and construction of the reservoir project, and they are also the key technical problems which have to be properly solved during project planning, design, construction, and operation management. The Yellow River is a heavy sediment-laden river. A rational prediction of sediment production and ensuring enough sediment transport water are the basic conditions of river flow with sand into sea; otherwise the sedimentation may occur, raise the riverbed, and aggravate flood threat. For this reason, researchers have attached great importance to the sedimentation analysis of the Yellow River and the fitting, forecasting, and other scientific research problems for sediment deposition, sediment production, and water demand for sediment transport. Compared with a single reservoir, basin cascade development mode, the river flow is under the influences of all levels of reservoirs storage and water discharges so that the risk of reservoir sedimentation becomes more serious and the relation between silt erosion and deposition is more complex. After the completion of a reservoir, starting with its initial impoundment, sediment is accumulation in the upriver reservoir area, especially reservoir area by dam. Bed load sediment blocked by dam is gradually accumulating in the reservoir area; meanwhile suspended load sediment is gradually deposited because of the flow velocity's decrease [3]. Improperly desilting design may also cause severe sedimentation after impoundment [4]. Downstream of this reservoir, driven by economic returns, the discharged volume may be much lower than the demand for sediment transportation which causes the risk of sand sedimentation.
Therefore, research of the risk of sediment deposition, the amount of sediment, and the balance of silt erosion and deposition in river basin cascade development mode can optimize sediment configuration, protect the built reservoir's usable capacity, extend the life service of the reservoir, and operate cascade reservoirs correctly. This has far-reaching significance for the overall efficiency of the cascade development.
In the research on prediction model of sediment erosion's changes, the domestic and foreign researchers have achieved some achievement, and the prediction models can be roughly divided into three categories: first: conceptual model of sediment deposition, such as regression analysis, mathematical statistics method [5]; second: numerical sediment model, such as hydrodynamics, hydrology, and sediment mathematical model [6]; and third: black box sediment model, such as fuzzy mathematical method, the gray system method, and the ANN model [7]. Although each prediction model has a certain level of applicability, with the influence of mathematical method, optimization solution, and practical application, there are some inevitable limitations of each of them. In the modeling analysis of reservoir sediment storage, various multiple regression analyses adopted intensively nowadays were established based on the assumption that there is no close correlation between each model's factor. While the actual situation is among impact factors of reservoir sediment meteorology, engineering, and social and economic factors, usually multiple correlation and varying degrees of uncertainty are existing. The most conventional least-squares regression analysis cannot effectively overcome the impact of the multiple correlation and relevant uncertainties among various model factors; even if multiple correlation coefficient [figure omitted; refer to PDF] has a high accuracy index, it can only represent that fitting accuracy between the model and measured data is high, but not showing the model is really effective in the analysis of the influence on each variable factor. If the model results are directly used to operationally manage the sediment flux into the reservoir, it may take a great risk.
Partial least-squares regression (PLSR) is a new multivariate data analysis method presented from application areas and mainly adopted for regression modeling analysis of single or multiple dependent variables on the multiple independent variables; it can effectively solve many problems which ordinary regression cannot solve. PLSR can also organically combine the basic functions of regression modeling, principal component analysis, and canonical correlation analysis. Within an algorithm, it can achieve regression modeling data structure simplification and correlation analysis between the two groups of variables. PLSR has been widely applied in many areas. Chun and Keles used PLSR for high- dimensional genomic data analysis and they proposed an efficient implementation of sparse partial least-squares regression and compared it with well-known variable selection and dimension reduction approaches via simulation experiments and proved the practical utility of sparse partial least-squares regression in a joint analysis of gene expression and genome-wide binding data [8]. P. P. Roy and K. Roy explored the fact that the optimum variable selection strategy for PLSR used a model dataset of cytoprotection data [9]. Carrascal et al. used PLSR as an alternative to current regression method in ecological studies, which pointed out that PLSR was more reliable than other techniques in identifying relevant variables and their magnitudes of influence [10].
Based on analysis of the complex causal relationships between the amount of sediment and their influencing factors, this paper proposed to adopt PLSR method to eliminate interference caused by multiple correlations and uncertainties of influencing factors of sediment flux into the reservoir in order to achieve model fitting and prediction of sediment amount of the reservoir in the cascade development mode, providing reliable technical support for joint dispatching, optimization sediment configuration, and extending the life of reservoir.
The main contents of this paper are as follows. The second section is the risk analysis of sediment deposition influence under the mode of drainage basin cascade development. The third section introduces the modeling ideas and procedures of sediment flux into the reservoir PLSR model. The fourth section selects the most representative cascade reservoir upstream of the Yellow River as the modeling instantiated application and modeling analysis. Finally, the results obtained are discussed.
2. Sediment Deposition Risk Analysis of River Basin Cascade Development
2.1. Analysis of Influencing Factors
The important means to prevent siltation of the Yellow River is strengthening its scientific use and management to ensure the ecological base flow and sediment transport. The main factors influencing the Yellow River sediment deposition are as follows [11, 12].
[figure omitted; refer to PDF] There are natural factors, including weather condition, vegetation condition, terrain condition, geological condition, and the inflow water and sediment condition.
[figure omitted; refer to PDF] There are engineering factors, including the impact of dam impoundment, the project construction, and the water storage of cascade reservoir.
[figure omitted; refer to PDF] Social and economic factors: during social economic development, irrational use of the river water resources may lead to a lack of base flow, discontinuous flow, and the river flow less than sediment transport demand, which are important causes of sediment deposition.
2.2. Risk Analysis of Sediment Deposition
The comprehensive analysis showed the risk of sedimentation basin cascade development mainly in the following aspects [13, 14].
[figure omitted; refer to PDF] There are environmental risks, reduction of arable land, soil desertification, fertility deterioration, and air quality deterioration.
[figure omitted; refer to PDF] Project benefit and risk: the constructions of cascade reservoirs block the original natural river, which lead to the river's flow pattern changes and the multilevel noncontinuous river morphology. As the effect of reservoir sediment affects the rivers erosion and sediment, the balance of the original river sediment is destroyed. Sediment deposition will decrease flood control capacity and limited storage capacity and shorten the operation life of reservoir [15].
[figure omitted; refer to PDF] Aggravating flood risks: during the flood, sedimentation will raise the flood level, which significantly increases the possibility of overrun of water height and river capacity under the same flow rate. Meanwhile, flood losses will be aggregated by the sedimentation in the flood storage region.
[figure omitted; refer to PDF] Other risks: clogged or silted channel, shipping difficulty, aggravation of water turbine wear, impact on the safe operation of the hub, siltation range extended, increased upstream flooding losses, downstream river's erosion and deformation influenced by reservoir discharged water, and pollutants attached to sediment affect water quality in the reservoir and so on.
3. Partial Least-Squared Regression Model of the Sediment Storage Volume in Cascade Development Reservoirs
3.1. The Basic Idea of Partial Least-Squares Regression
Suppose that there are [figure omitted; refer to PDF] independent variables [figure omitted; refer to PDF] and [figure omitted; refer to PDF] dependent variables [figure omitted; refer to PDF] . In order to study the statistical relationship between dependent variables and independent variables, [figure omitted; refer to PDF] sample points are collected and constitute data table of the independent variables and dependent variables: [figure omitted; refer to PDF] and dependent variables [figure omitted; refer to PDF] . Extract the principal components [figure omitted; refer to PDF] and [figure omitted; refer to PDF] from [figure omitted; refer to PDF] and [figure omitted; refer to PDF] , respectively, where [figure omitted; refer to PDF] and [figure omitted; refer to PDF] are the linear combination of [figure omitted; refer to PDF] and [figure omitted; refer to PDF] . [figure omitted; refer to PDF] and [figure omitted; refer to PDF] should carry their variation information of their own data table as much as possible to maximize their relevance while extracting the two components [16, 17].
After extracting the first principal components [figure omitted; refer to PDF] and [figure omitted; refer to PDF] , make the regression of [figure omitted; refer to PDF] on [figure omitted; refer to PDF] and [figure omitted; refer to PDF] on [figure omitted; refer to PDF] , respectively; then use residual information to extract the main ingredients for the second round. Continue to implement the return of [figure omitted; refer to PDF] on [figure omitted; refer to PDF] and [figure omitted; refer to PDF] on [figure omitted; refer to PDF] until a satisfactory accuracy is achieved [18]. Ultimately extract the [figure omitted; refer to PDF] components [figure omitted; refer to PDF] from [figure omitted; refer to PDF] ; the regression of [figure omitted; refer to PDF] on [figure omitted; refer to PDF] can then be transformed into the regression equation of [figure omitted; refer to PDF] ( [figure omitted; refer to PDF] ) on the original variables [figure omitted; refer to PDF] ; this completes the partial least-squared regression modeling.
3.2. PLSR Model of Sediment Storage Volume in Cascade Development Reservoirs
Denoting dependent variables (sediment storage volume) by [figure omitted; refer to PDF] , then the independent variable set is [figure omitted; refer to PDF] , [figure omitted; refer to PDF] . The standardized independent variables matrix of [figure omitted; refer to PDF] is denoted as [figure omitted; refer to PDF] , and the standardized dependent variables matrix of [figure omitted; refer to PDF] is denoted as [figure omitted; refer to PDF] : [figure omitted; refer to PDF] where [figure omitted; refer to PDF] is the mean value of [figure omitted; refer to PDF] and [figure omitted; refer to PDF] is the standard deviation error of [figure omitted; refer to PDF] .
In the first step, the unit vectors [figure omitted; refer to PDF] and [figure omitted; refer to PDF] are known; for the single dependent variable [figure omitted; refer to PDF] , its component [figure omitted; refer to PDF] equals [figure omitted; refer to PDF] ; then [figure omitted; refer to PDF] where [figure omitted; refer to PDF] is the simple correlation coefficient.
If so, the optimization value of objective function is [figure omitted; refer to PDF] The regression values of [figure omitted; refer to PDF] and [figure omitted; refer to PDF] on [figure omitted; refer to PDF] are calculated, respectively; [figure omitted; refer to PDF] where [figure omitted; refer to PDF] and [figure omitted; refer to PDF] are residual matrices, [figure omitted; refer to PDF] and [figure omitted; refer to PDF] are regression coefficients, and [figure omitted; refer to PDF] is invariant and [figure omitted; refer to PDF] .
In the second step replace [figure omitted; refer to PDF] , [figure omitted; refer to PDF] with [figure omitted; refer to PDF] , [figure omitted; refer to PDF] , respectively. Repeat the first step to implement the regression of [figure omitted; refer to PDF] and [figure omitted; refer to PDF] on [figure omitted; refer to PDF] and obtain the regression coefficients [figure omitted; refer to PDF] and [figure omitted; refer to PDF] . Conduct partial least-squares regression and so on.
In the [figure omitted; refer to PDF] step, according to the cross-validation test result of the model's accuracy, eventually supposing extracted components [figure omitted; refer to PDF] , then [figure omitted; refer to PDF]
Conduct the regression of [figure omitted; refer to PDF] on [figure omitted; refer to PDF] ; then will get [figure omitted; refer to PDF]
Because [figure omitted; refer to PDF] is a linear combination of [figure omitted; refer to PDF] , [figure omitted; refer to PDF] ; therefore [figure omitted; refer to PDF]
Order [figure omitted; refer to PDF] , [figure omitted; refer to PDF] , and [figure omitted; refer to PDF] ( [figure omitted; refer to PDF] ) is regression coefficient of [figure omitted; refer to PDF] , then: [figure omitted; refer to PDF] where [figure omitted; refer to PDF] is the fitted values of the sediment flux into the reservoir (the dependent variable), [figure omitted; refer to PDF] ( [figure omitted; refer to PDF] ) is the various influencing factors of the volume of sand storage (the independent variables), the formula (9) is just the PLSR model expression for the sediment storage of a reservoir in cascade development.
3.3. Factors Multicorrelation Analysis
According to principal component analysis, under the premise of the sediment storage data with minimal loss, make dimension reduction for high-dimensional data systems; when the original [figure omitted; refer to PDF] -dimensional data is reduced to two-dimensional system, the location of all the sample points can be drawn out on the two-dimensional plan, which can be directly observed as similar structure of [figure omitted; refer to PDF] -dimensional space. After establishing the PLSR model, use the extracted components [figure omitted; refer to PDF] and [figure omitted; refer to PDF] directly, do a chart view of [figure omitted; refer to PDF] , make [figure omitted; refer to PDF] as coordinate points of the sample points, and then plot the location of all sample points to analyze distribution and structural similarity of sample points in high-dimensional space.
According to the theory and the specific steps of PLSR modeling, we can use the MATLAB language to compile the PLSR analysis program of sediment storage in cascade development.
4. Application and Analysis of Engineering Case
4.1. Basic Information
The upper reaches of the Yellow River between Longyangxia and Liujiaxia section mainly have six large-sized cascade hydropower stations, which are Longyangxia, Laxiwa, Lijiaxia, Gongboxia, Jishixia, and Liujiaxia from upstream to downstream, as shown in Figure 1.
Figure 1: Sketch map of cascade hydropower stations layout between Longyangxia and Liujiaxia section in the Yellow River.
[figure omitted; refer to PDF]
Longyangxia hydropower station is the leading hydropower station in the main stream of the Yellow River, with a total reservoir capacity of 274 × 108 m3 and less sediment concentration, at which control basin is one of the few large-scale runoff regional stabilities and is located in 1687 km from the source of the Yellow River. Jishixia hydropower station is fifth large-scale cascade hydropower station in the Long-Liu segment of the Yellow River, with the dam located at the outlet of Jishixia canyon in the Yellow River, up from Gongboxia hydropower station about 55 km, down from Liujiaxia hydropower station about 93 km. It is a daily regulating reservoir with the total capacity of 2.94 × 108 m3 [19]. The basic statistics of other cascade hydropower stations in Long-Liu section of the Yellow River are showed in Table 1.
Table 1: The basic statistics of other cascade hydropower stations between Longyangxia and Liujiaxia section.
Hydropower stations | Dam height (m) | Dam types | Basin size of controlling (km2 ) | Normal storage level/dead water level (m) | Total capacity/regulation capacity (108 m3 ) | Water storage date (year) |
Longyangxia | 178 | VA | 131420 | 2600/2530 | 247/193.5 | 1986 |
Laxiwa | 250 | VA | 132160 | 2452/2440 | 10.56/1.5 | 2009 |
Lijiaxia | 165 | VA | 136747 | 2180/2178 | 16.5/0.6 | 1996 |
Gongboxia | 127 | CFRD | 143619 | 2005/2002 | 6.2/0.75 | 2004 |
Jishixia | 100 | CFRD | 146749 | 1856/1852 | 2.94/0.45 | 2010 |
Liujiaxia | 147 | PG | 173000 | 1735/1694 | 57/41.5 | 1968 |
Note: the dam type code in Table 1 refers to the ICOLD code.
Each cascade hydropower station in the Long-Liu section is distributed between Tangnaihai and Xunhua Hydrometrical Stations. Tangnaihai Hydrometrical Station is located along the eastern edge of the Qinghai-Tibet Plateau, the boundary between the natural runoff and manually adjusted section, which is an important control section on the upper reaches of the Yellow River. It is also a storage station of the Longyangxia Reservoir, with 121,972 km2 control drainage area, accounting for 92.8% of Longyangxia Gorge Reservoir control area; the annual average sediment concentration is 0.61 kg/m3 [20]. Xunhua Hydrometrical Station is the control station in Qinghai Province, as storage station of Jishixia reservoir, with 145,459 km2 control area. Before the year of 1985 the annual runoff was not affected by human activities, but, after 1986, with the building of the reservoirs such as Longyangxia Reservoir, the measured data has included and reflected the impact of the upstream cascade regulating reservoirs. The measured water and sediment statistics of Tangnaihai and Xunhua Hydrometrical Stations are shown in Tables 2~4.
Table 2: The measured water and sediment statistics of Tangnaihai Hydrometrical Station (1956 to 2004).
Years | Average annual runoff (108 m3 ) | Average annual sediment load (104 t) | ||
Flood season | Full year | Flood season | Full year | |
1956-1985 | 127.8 | 213.1 | 950.3 | 1301.8 |
1986-1996 | 111.7 | 187.5 | 889.7 | 1289.1 |
1997-2004 | 98.9 | 167.9 | 839.5 | 1106.4 |
Table 3: The average sediment load value monthly measured and year allocation of Tangnaihai Hydrometrical Station (1982).
Month | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | Full year |
Sediment load (104 t) | 2.2 | 2.2 | 11.2 | 29 | 145 | 675.7 | 461.6 | 303.3 | 405.9 | 165 | 24.5 | 4.4 | 2230 |
| |||||||||||||
% | 0.1 | 0.1 | 0.5 | 1.3 | 6.5 | 30.3 | 20.7 | 13.6 | 18.2 | 7.4 | 1.1 | 0.2 | 100 |
Table 4: The measured water and sediment statistics of Xunhua Hydrometrical Station (1956 to 2004).
Years | Average annual runoff (108 m3 ) | Average annual sediment load (104 t) | ||
Flood season | Full year | Flood season | Full year | |
1956-1985 | 137.9 | 232.8 | 2840.2 | 3623.6 |
1986-1996 | 75.9 | 192 | 1490.2 | 1909 |
1997-2004 | 55.2 | 159.2 | 894.6 | 1169.8 |
4.2. Factor Selection and PLSR Model Establishment
Making an exact fitting about the amount of sediment in the reservoir is significant for reasonable prediction of reservoir sedimentation and scientifically determines water demand for sediment. Due to multi-correlations among each factor (such as rainfall amount, natural runoff, sediment transport rate, the amount of water discharged from upper reservoir, water level of the upper reservoir, water level of the downstream reservoir, water temperature and other factors), which influence sediment flux into each cascade reservoir, so adopting the PLSR model established before to fitting.
Main factors affecting the sediment storage are rainfall amount within the drainage area, runoff, upstream water level and the discharging water, the backup water level of downstream reservoir and discharged volume of this level's reservoir, natural river runoff, water temperature, sediment transport rate, and so on. For this reason, in the mode of cascade development, the PLSR model of sediment quantity is composed of runoff factor component [figure omitted; refer to PDF] , sediment discharge factor component [figure omitted; refer to PDF] , rainfall factor component [figure omitted; refer to PDF] , water level factor component [figure omitted; refer to PDF] , water temperature factor component [figure omitted; refer to PDF] , discharge water factor component [figure omitted; refer to PDF] , the constant [figure omitted; refer to PDF] , and so forth. That is, [figure omitted; refer to PDF]
According to (8) to reform the above equation into formula (9), we can get the PLSR model expression of sediment storage in the Long-Liu section of the Yellow River under cascade development mode: [figure omitted; refer to PDF] where [figure omitted; refer to PDF] is fitted values of sediment storage, [figure omitted; refer to PDF] is various influencing factors affecting sediment storage, [figure omitted; refer to PDF] is the partial least-squares regression coefficients corresponding to each [figure omitted; refer to PDF] , [figure omitted; refer to PDF] is a constant, and [figure omitted; refer to PDF] represents the amount of sediment storage factor. It is necessary to consider actual state to select factors. For different time periods, cascade reservoirs in different locations, the selected model factors may be different.
4.3. Fitting Results and Comparative Analysis of PLSR Model
Considering the influence on the downstream channel and the reservoir sediment transportation caused by water storage of Longyangxia, this paper takes the Longyangxia and Liujiaxia reservoirs as example of built PLSR fitting model of sediment storage. Selecting the monthly average sediment storage capacity from January 1982 to December 1987 as the fitting time, including important periods from the Longyangxia Reservoir, water level gradually increased to the normal water level during initial impoundment so that it can better analyze the influence that water storage of Longyangxia Reservoir for sediment flux into downstream reservoir. A PLSR fitting model for sediment storage of Longyangxia and Liujiaxia Reservoirs is shown in Figures 2 and 3.
Figure 2: Fitting chart of PLSR model for sediment storage of Longyangxia.
[figure omitted; refer to PDF]
Figure 3: Fitting chart of PLSR model for sediment storage of Liujiaxia.
[figure omitted; refer to PDF]
Multicorrelation analysis of factors: take rainfall factor set [figure omitted; refer to PDF] and transport rate factor set [figure omitted; refer to PDF] as example, extract the first components [figure omitted; refer to PDF] and [figure omitted; refer to PDF] , and draw plan of [figure omitted; refer to PDF] , as shown in Figure 4. As can be seen, compositions [figure omitted; refer to PDF] and [figure omitted; refer to PDF] appear in roughly linear correlation changes, which suggests that between rainfall factor and transport rate factor of influence reservoir sediment exists in a complex correlation. In this case, the conventional least-squares regression is difficult to separate pressure, temperature, rainfall, and aging components; thus using PLSR to do modeling analysis is more rational and effective.
Figure 4: The first principal component distribution of rainfall and sediment transport rate factor [figure omitted; refer to PDF] , [figure omitted; refer to PDF] .
[figure omitted; refer to PDF]
According to Figures 2 and 3, the following can be found.
[figure omitted; refer to PDF] Focusing on the PLSR model of sediment storage of the cascade reservoirs in the Long-Liu section, it largely overcame the multicorrelation between the model factors and can effectively separate the various influencing factors. Meanwhile, model fitting has high precise results that can better reflect the actual changes of sediment storage and explain the impact of each factor on the amount of storage reservoir sediment.
[figure omitted; refer to PDF] The fitting sequence is made of monthly average sediment storage of Longyangxia and Liujiaxia Reservoirs, whose sediment storage in the previous 60 months is large while, due to the influence of water impoundment by Longyangxia, (corresponding to those in 1987), the incoming-reservoir sediment production decreases during later 60 months, which indicates that the leading reservoir's impoundment has an important influence on the cascade development of river sediment transport.
[figure omitted; refer to PDF] The sediment storage is larger in the flood season every year, while it decreases obviously in dry seasons. It is characterized by cyclical changes significantly and is in line with the general rules of sediment yield and transport.
[figure omitted; refer to PDF] The main factors affecting the amount of sediment storage are the changes of transport rate, and its model factor [figure omitted; refer to PDF] had a large impact on maximum amount of sediment storage; additionally, the influence of runoff factor [figure omitted; refer to PDF] , water factor [figure omitted; refer to PDF] , and discharge water factor [figure omitted; refer to PDF] is relatively large, while the impact of rainfall and temperature factors [figure omitted; refer to PDF] and [figure omitted; refer to PDF] is relatively small.
5. Conclusions
Under the cascade development mode, river flow is influenced by the reservoir impoundment of each cascade and discharge flow, reservoir sedimentation encounters greater risks; the relations between the erosion and deposition become more complicated. For this reason, on the basis of systematic analysis for sediment deposition risk of cascade development in the upstream of the Yellow River's, mainly studied the model and fitting method of sediment flux into the reservoir under cascade development mode.
Considering the difficulty to effectively identify and eliminate the multiple correlation influence among the independent factors by least-squares regression, the partial least-squares regression (PLSR) method is adopted for modeling analysis; the model fitting is organically combined with the non-model-style data content analysis, so as to realize the regression model, data structure simplification, and multiple correlations analysis among factors; meanwhile the accuracy of the model is ensured through cross validity check.
The modeling analysis of sediment flux into the cascade reservoirs of Long-Liu section upstream of the Yellow River indicates that partial least-squares regression can effectively overcome the multiple correlation influence among factors, and the isolated factor variables have better ability to explain the physical cause of measured results.
Acknowledgments
The authors would like to express their sincere gratitude to anonymous reviewers who gave them some constructive comments, criticisms, and suggestions. This work was supported by the Project of National Natural Science Foundation of China (no. 41301597), the National Key Laboratory of Northwest Arid Area Ecological Hydraulic Engineering Foundation Project of Shaanxi Province in China (106-221225), the Open Research Fund of State Key Laboratory of Simulation and Regulation of Water Cycle in River Basin (IWHR-SKL-201303), CRSRI Open Research Program (CKWV2013202/KY), and Program 2013KCT-15 for Shaanxi Provincial Key Innovative Research Team.
Conflict of Interests
The authors declare that there is no conflict of interests regarding the publication of this paper.
[1] Y. Tian, X. P. Li, Y. Li, "Analysis of sediment load distribution in Yellow River," Journal of Sediment Research , no. 1, pp. 65-69, 2011.
[2] B. S. Wu, T. You, "Theoretical model for delayed response of reservoir sedimentation," Journal of Hydraulic Engineering , vol. 39, no. 5, pp. 627-632, 2008.
[3] J. Tibby, P. Gell, G. Hancock, M. Clark, "Complex reservoir sedimentation revealed by an unusual combination of sediment records, Kangaroo Creek reservoir, South Australia," Journal of Paleolimnology , vol. 43, no. 3, pp. 535-549, 2010.
[4] S. Rakhmatullaev, F. Huneau, H. Celle-Jeanton, P. Le Coustumer, M. Motelica-Heino, M. Bakiev, "Water reservoirs, irrigation and sedimentation in Central Asia: a first-cut assessment for Uzbekistan," Environmental Earth Sciences , vol. 68, no. 4, pp. 985-998, 2013.
[5] M. A. Chaudhry, M. Habib-ur-Rehman, M. N. Akhtar, H. N. Hashmi, "Modeling sediment deposition and sediment flushing through reservoirs using 1-D numerical model," Arabian Journal for Science and Engineering , vol. 39, no. 2, pp. 647-658, 2014.
[6] A. J. Kettner, J. P. M. Syvitski, "HydroTrend v.3.0: a climate-driven hydrological transport model that simulates discharge and sediment load leaving a river system," Computers & Geosciences , vol. 34, no. 10, pp. 1170-1183, 2008.
[7] R. Ranzi, T. H. Le, M. C. Rulli, "A RUSLE approach to model suspended sediment load in the Lo river (Vietnam): effects of reservoirs and land use changes," Journal of Hydrology , vol. 422-423, pp. 17-29, 2012.
[8] H. Chun, S. Keles, "Sparse partial least squares regression for simultaneous dimension reduction and variable selection," Journal of the Royal Statistical Society Series B: Statistical Methodology , vol. 72, no. 1, pp. 3-25, 2010.
[9] P. P. Roy, K. Roy, "On some aspects of variable selection for partial least squares regression models," QSAR & Combinatorial Science , vol. 27, no. 3, pp. 302-313, 2008.
[10] L. M. Carrascal, I. Galvan, O. Gordo, "Partial least squares regression as an alternative to current regression methods used in ecology," Oikos , vol. 118, no. 5, pp. 681-690, 2009.
[11] Y. Qin, X. Zhang, F. Wang, H. Yan, H. Han, "Scour and silting evolution and its influencing factors in Inner Mongolian Reach of the Yellow River," Journal of Geographical Sciences , vol. 21, no. 6, pp. 1037-1046, 2011.
[12] R. T. Kingsford, "Ecological impacts of dams, water diversions and river management on floodplain wetlands in Australia," Austral Ecology , vol. 25, no. 2, pp. 109-127, 2000.
[13] M. Gibbs, "Ecological risk assessment, prediction, and assessing risk predictions," Risk Analysis , vol. 31, no. 11, pp. 1784-1788, 2011.
[14] F. R. Hauer, M. S. Lorang, "River regulation, decline of ecological resources, and potential for restoration in a semi-arid lands river in the western USA," Aquatic Sciences , vol. 66, no. 4, pp. 388-401, 2004.
[15] Y. Jie, Z. Chengcheng, J. Dejun, H. Dexiu, "Research advances in risk assessment and enforcement of unsafe reservoirs," Advances in Water Science , vol. 25, no. 1, pp. 148-154, 2014.
[16] G.-H. Fu, Q.-S. Xu, H.-D. Li, D.-S. Cao, Y. I.-Z. Liang, "Elastic net grouping variable selection combined with partial least squares regression (EN-PLSR) for the analysis of strongly multi-collinear spectroscopic data," Applied Spectroscopy , vol. 65, no. 4, pp. 402-408, 2011.
[17] H. Hung, P. S. Wu, I. P. Tu, S. Y. Huang, "On multilinear principal component analysis of order-two tensors," Biometrika , vol. 99, no. 3, pp. 569-583, 2012.
[18] M. Kuroda, Y. Mori, M. Iizuka, M. Sakakihara, "Acceleration of the alternating least squares algorithm for principal components analysis," Computational Statistics & Data Analysis , vol. 55, no. 1, pp. 143-153, 2011.
[19] S. Z. Hou, P. Wang, Y. Guo, W. Chu, "Analysis of water and sediment regulation of Longyangxia reservoir," Journal of Hydroelectric Engineering , vol. 32, no. 6, pp. 151-156, 2013.
[20] W. S. Li, L. Feng, X. J. Gao, "Estimation of sedimentation rate of the Longyangxia reservoir," Northwest Water Power , no. 4, pp. 3-4, 2001.
You have requested "on-the-fly" machine translation of selected content from our databases. This functionality is provided solely for your convenience and is in no way intended to replace human translation. Show full disclaimer
Neither ProQuest nor its licensors make any representations or warranties with respect to the translations. The translations are automatically generated "AS IS" and "AS AVAILABLE" and are not retained in our systems. PROQUEST AND ITS LICENSORS SPECIFICALLY DISCLAIM ANY AND ALL EXPRESS OR IMPLIED WARRANTIES, INCLUDING WITHOUT LIMITATION, ANY WARRANTIES FOR AVAILABILITY, ACCURACY, TIMELINESS, COMPLETENESS, NON-INFRINGMENT, MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE. Your use of the translations is subject to all use restrictions contained in your Electronic Products License Agreement and by using the translation functionality you agree to forgo any and all claims against ProQuest or its licensors for your use of the translation functionality and any output derived there from. Hide full disclaimer
Copyright © 2015 Jie Yang et al. This is an open access article distributed under the Creative Commons Attribution License, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Abstract
It is difficult to effectively identify and eliminate the multiple correlation influence among the independent factors by least-squares regression. Focusing on this insufficiency, the sediment deposition risk of cascade reservoirs and fitting model of sediment flux into the reservoir are studied. The partial least-squares regression (PLSR) method is adopted for modeling analysis; the model fitting is organically combined with the non-model-style data content analysis, so as to realize the regression model, data structure simplification, and multiple correlations analysis among factors; meanwhile the accuracy of the model is ensured through cross validity check. The modeling analysis of sediment flux into the cascade reservoirs of Long-Liu section upstream of the Yellow River indicates that partial least-squares regression can effectively overcome the multiple correlation influence among factors, and the isolated factor variables have better ability to explain the physical cause of measured results.
You have requested "on-the-fly" machine translation of selected content from our databases. This functionality is provided solely for your convenience and is in no way intended to replace human translation. Show full disclaimer
Neither ProQuest nor its licensors make any representations or warranties with respect to the translations. The translations are automatically generated "AS IS" and "AS AVAILABLE" and are not retained in our systems. PROQUEST AND ITS LICENSORS SPECIFICALLY DISCLAIM ANY AND ALL EXPRESS OR IMPLIED WARRANTIES, INCLUDING WITHOUT LIMITATION, ANY WARRANTIES FOR AVAILABILITY, ACCURACY, TIMELINESS, COMPLETENESS, NON-INFRINGMENT, MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE. Your use of the translations is subject to all use restrictions contained in your Electronic Products License Agreement and by using the translation functionality you agree to forgo any and all claims against ProQuest or its licensors for your use of the translation functionality and any output derived there from. Hide full disclaimer