Content area
Full text
Received 16 October 2014; Revised 4 November 2014; Accepted 4 December 2014
Academic Editor: Guangbo Hao
Copyright © YujunWang et al. This is an open access article distributed under the Creative Commons Attribution License, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
In order to improve the efficiency of underground mining and tunneling operations and to realize automatic drilling, it is necessary to develop the automation system for large drill jumbos. This work focuses on one such mining drill jumbo which is actually a redundant robotic manipulator with eight degrees of freedom, because it has six revolute joints and two prismatic joints. To realize the autonomous drilling operation, algorithms are proposed to calculate the desired pose of the end-effector and to solve the inverse kinematics of the drill jumbo, which is one of the key issues for developing the automation system. After that, a control strategy is proposed to independently control the eight joint variables using PID feedback control approaches. The simulation model is developed in Simulink. As the closed-loop controllers corresponding to all joints are local and independent of each other, the whole system is not a closed-loop feedback control. In order to estimate the possible maximal pose error, the analysis of the pose error caused by the errors of the joint variables is conducted.The results are satisfactory for mining applications and the developed automation system is being applied in the drill jumbos built by Mining Technologies International Inc.
(ProQuest: ... denotes formulae omitted.)
1. Introduction
In mining industry, drilling is a very important task. About 75% of the mineral materials are excavated underground using the drill and blast method [1]. Hence, the economic importance of efficient drill jumbos used for drilling task becomes evident. Different types of drill jumbos have been developed to accomplish the demands of higher production rates and better efficiencies in activities such as hard rock mining and tunnel construction [2]. Most drill jumbos in operation today aremanually operated [3]. The manual operation of drill jumbos has some disadvantages. For instance, the operation efficiency is low, because the operators need to manually move the drill to the desired locations of the holes on the mine face using several joysticks. This...