Abstract

ITER-India, the Indian domestic agency for the ITER project, has the responsibility to supply a set of two high power Gyrotron sources (1 MW, 170 GHz, 3600 s) along with the auxiliary systems for Electron Cyclotron Heating & Current Drive applications. For such high power Gyrotron systems, one of the challenging areas is the system integration and establishment of reliable integrated system performance. ITER-India plans to establish the integrated Gyrotron system performance that essentially meets the ITER requirements in a Gyrotron Test Facility which is specifically being developed at ITER-India. This paper discusses about the recent updates towards the Test Facility development which includes, development of cost effective & modular Body Power Supply (BPS), Industrial grade prototype interlock & protection modules, a Gyrotron field simulator and cooling water distribution system.

Details

Title
Developments towards 1MW Gyrotron Test Facility at ITER-India
Author
Rathod, Vipal; E Sharan Dilip; Shah, Ronak; Mandge, Deepak; Yadav, Amit; Sharma, Anjali; Parmar, Rajvi; Singh, N P; Rao, S L
Section
Technology
Publication year
2019
Publication date
2019
Publisher
EDP Sciences
ISSN
21016275
e-ISSN
2100014X
Source type
Conference Paper
Language of publication
English
ProQuest document ID
2285043800
Copyright
© 2019. This work is licensed under http://creativecommons.org/licenses/by/4.0 (the “License”). Notwithstanding the ProQuest Terms and conditions, you may use this content in accordance with the terms of the License.