Full Text

Turn on search term navigation

© 2020. This work is published under NOCC (the “License”). Notwithstanding the ProQuest Terms and Conditions, you may use this content in accordance with the terms of the License.

Abstract

Baselines are often employed in shared water saving contracts for estimating water savings after some type of intervention by the water service company. An adjustment to the baseline may become necessary under certain conditions. Earlier work has described a number of relatively complex methods for baseline determination and adjustment, but application in regions faced with relatively limited data becomes problematic. If the adjustment were determined before finalising the contractual matters, it would be possible to gather the required data in order to determine the adjustment. However, in cases where no adjustment was fixed prior to the contract, a method is required to determine an adjustment mid-contract based on whatever data are available at the time. This paper presents a methodology for baseline adjustment in an existing shared water savings contract and explains how adjustment could be determined mid-contract, under conditions of limited data. The adjustment compensates for expected reduced water consumption due to external influences induced by serious water restrictions, typically introduced during periods of drought. The fundamental principle underpinning the baseline adjustment methodology presented in this paper involved segregating real water losses from the actual consumption of end-users, preferably by analysing the minimum night flow. In the absence of recorded night flows, an alternative procedure involving the minimum monthly consumption pre- and post-baseline was employed. The baseline adjustment method was subsequently applied in a South African case study, reported on separately. This technique is helpful because adjustments could be determined without adding unnecessary complexity or cost, and provides a means to resolve disputes in cases where unexpected savings occur mid-contract.

Details

Title
Baseline adjustment methodology in a shared water savings contract under serious drought conditions
Author
Jacobs, H E 1 ; Du Plessis, J L 1 ; Nel, Nicole 1 ; Gugushe, S 2 ; Levin, S 3 

 Department of Civil Engineering, Stellenbosch University, Private Bag XI, Matieland, 7602, South Africa 
 Water & Energy Saving Management, National Department of Public Works, Western Cape Regional Office, Customs House, Foreshore, Cape Town, South Africa 
 Water Projects in Facilities Management, National Department of Public Works, Head Office, Pretoria, South Africa 
Pages
22-29
Section
Research paper
Publication year
2020
Publication date
Jan 2020
Publisher
Water Research Commission
ISSN
03784738
Source type
Scholarly Journal
Language of publication
English
ProQuest document ID
2384853359
Copyright
© 2020. This work is published under NOCC (the “License”). Notwithstanding the ProQuest Terms and Conditions, you may use this content in accordance with the terms of the License.