Abstract
The settlement of soft soil foundation is a critical problem for the airport construction in coastal area. In order to study the long-term settlement characteristics of soft soil foundation of a Chinese reclamation airport (Xiamen Airport), this paper analyzed the monitoring settlement development of different regions in two runways to be built. The relationship between the total settlement from January 11, 2019 to May 22, 2020 and the thickness of soft soil was studied for guiding the settlement prediction of subsequent construction. The results showed that the development law of foundation settlement with different preloading durations under the same thickness of soft soil is different. As the preloading duration increases, the total settlement in the same period becomes smaller. Besides, the total settlement of Runway 2 increases approximately linearly with the thickness of soft soil (silt soil). However, the total settlement of Runway 1 under different thickness of soft soil is similar, which probably indicates primary consolidation has basically completed in this region. The research results in this paper is useful to understanding the settlement characteristics of Xiamen Airport, and can be used to analyse the settlement characteristics of other similar reclamation airports.
You have requested "on-the-fly" machine translation of selected content from our databases. This functionality is provided solely for your convenience and is in no way intended to replace human translation. Show full disclaimer
Neither ProQuest nor its licensors make any representations or warranties with respect to the translations. The translations are automatically generated "AS IS" and "AS AVAILABLE" and are not retained in our systems. PROQUEST AND ITS LICENSORS SPECIFICALLY DISCLAIM ANY AND ALL EXPRESS OR IMPLIED WARRANTIES, INCLUDING WITHOUT LIMITATION, ANY WARRANTIES FOR AVAILABILITY, ACCURACY, TIMELINESS, COMPLETENESS, NON-INFRINGMENT, MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE. Your use of the translations is subject to all use restrictions contained in your Electronic Products License Agreement and by using the translation functionality you agree to forgo any and all claims against ProQuest or its licensors for your use of the translation functionality and any output derived there from. Hide full disclaimer
Details
1 Xiamen Xiang’an Airport Investment and Construction Co., Ltd, Xiamen 361006, Fujian, China
2 Coastal and urban Geotechnical Engineering Research Centre of Zhejiang university, Hangzhou 310058, Zhejiang, China