This is an open access article distributed under the Creative Commons Attribution License, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
1. Introduction
Due to the progress of bridge construction technology and the demand for practicability and appreciation of municipal bridges, self-anchored suspension bridge has become a very competitive bridge type because of its economy, elegant appearance, good adaptability, and reasonable stress state [1]. At the same time, with the continuous growth of the requirement for bridge traffic capacity, the widths of bridges develop to eight lanes or even wider, which makes the proportion of structural self-weight in structural design rising gradually [2]. To reduce the dead weight of the beam as much as possible, the thin-walled steel box girder is generally used as the stiffening girder of bridge [3]. Double-sided steel box girder is a special form of thin-walled steel box girder which is developed through the application of practical engineering. It reduces the self-weight and widens the bridge by removing the bottom plate of steel box girder, and adds a diaphragm or crossbeam to ensure the integrity and torsional stiffness [4]. Hence, some self-anchored suspension bridges with double-sided steel box girder have been applied to practice. These bridges with large span and width play important roles as traffic hubs in the actual use and have been in a heavy traffic environment, which makes their deformation and mechanical behaviour more complex. These make the stress characteristics, stress distribution, and structural load response of self-anchored suspension bridge with double-sided steel box girder become key issues in the field of bridge engineering [5].
Vehicle load is the most common external load on bridge, and it is also one of the main causes of bridge damage [6]. In recent years, the increase in traffic volume and heavy vehicles leads the vehicle load to improve, which makes damage risk of the bridges caused by vehicle load increasing [7, 8]. Therefore, it is necessary to study the mechanical properties of the bridge under vehicle load to understand the real deformation and stress state of the bridge, which is important to ensure safety and guide bridge design [9]. At present, researchers mainly study the influences of vehicle load on bridges through field tests, lab experiments, and numerical simulation [10]. Madrazo-Aguirre et al. [11] pointed out that it is dangerous for bridges to be subjected to eccentric loads, and the thickness of top plate and the type of beam section are the main factors that affect the load response of bridges. Cheng and Shen [12] found that the midspan deflection and suspender cable force gradually increased with the load, and due to the influence of random factors such as temperature and wind load, the bridge response would be random. Ding et al. [13] concluded that there is a time delay effect in the displacement of the main span of the bridge under the vehicle load, and the load would cause the deflection and the displacement vibration effect. Thus, the research studies on cable-stayed bridge, ground-anchored concrete suspension bridge, and continuous beam bridge are relatively common, while few researchers have studied the deformation behaviour and load response of self-anchored suspension bridge under the action of vehicle load [14, 15].
In addition to the structural load response of the self-anchored suspension bridge, the mechanical behaviour of the main girder is also related to the safety the bridge. When the double-sided steel box girder is used as the main girder of the self-anchored suspension bridge, its spatial mechanical performance is complex under the influence of huge force and big width [16]. Zhou et al. [17] studied the stress distribution of double-sided box girder through field test, finding that under symmetrical load, the longitudinal stresses of beam top and bottom plate are M-shaped along the transverse direction, and the maximum stress increment is located at the junction of top, bottom plate, and inner web. Many studies show that there is an obvious shear lag effect in thin-walled box girders, which enhances beam width, and diaphragms and stiffening ribs would also affect it [3, 18]. For double-sided steel box girders, the shear lag effect might be more prominent and even cause excessive local stress, resulting in structural damage. In sum up, the differences between this type of girders and common box girders are shown in Table 1. Therefore, it is necessary to research the shear lag effect of double-sided steel box girder. The section parameters design has a great influence on the stress distribution. Zang [19] studied the failure types and causes of bridge deck pavement and found that improper selection of design parameters and serious overloading were the two main reasons leading to the bridge deck pavement cracking. However, there is still a lack of research on the parameter design of double-sided steel box girder, and the influence of each structural size on the beam is not fully understood.
Table 1
The differences between the ultra-wide double-sided steel box girders and common box girders.
Ultra-wide double-sided steel box girder | Common steel box girder | |
Deformation | The deformation of deck center is greater than the sides. | The deformation of deck at each box center is greatest. |
Top plate stress | There are obvious shear lag effect and fatigue stress. | The shear lag effect is slightly smaller than the former. |
Torsional performance | It has excellent torsional resistant performance. | It also has good torsional resistant performance, but it is smaller than the former. |
Design focus | The shear lag effect, fatigue damage, and crossbeams. | The overturning resistance, stiffening ribs, and crossbeams. |
So as to make up for the deficiency of the existing research, in this paper, the Yunlongwan Bridge was used to study the overall mechanical properties and deformation of ultra-wide double-sided steel box girder self-anchored suspension bridge under vehicle load. The distribution of longitudinal stress and shear lag effect of main girder was emphatically analysed. Then, the multiscale model of the bridge was established using the finite element software ANSYS, and the accuracy of the model was verified by comparing the test data. Finally, based on the established model, the effects of U-rib thickness, diaphragm spacing, and vehicle load on the mechanical properties of the top plate of key sections were studied. This study contributes to the interpretation of the complex mechanical behaviour of self-anchored suspension bridges, which is of great importance for bridge design and operational safety.
2. Example Bridge and Experimental Programme
2.1. Basic Information of the Example Bridge
The Yunlongwan Bridge is a two-tower three-span self-anchored suspension bridge with double-cable face and ultra-wide double-sided steel box girder which has been completed, as shown in Figure 1. It is the largest self-anchored suspension bridge with the largest span and width in Sichuan Province. There are eight motorways, two nonmotorized vehicle lanes, and two footpaths on the deck.
[figure omitted; refer to PDF]
The bridge span arrangements are (30 + 80 + 205 + 80 + 30) m, and the theoretical span of main bridge is (83.2 + 205 + 83.2) m. The main cables with double-cable surface adopt high-strength zinc-aluminum alloy parallel wire with an area of 0.0542 m2, and the distance between the two cables is 40 m. There are 31 pairs of suspenders on the bridge, which are made of the same material as the main cable, and the cross-sectional area of each suspender is 0.004887 m2. The longitudinal distance between the two suspenders is 10 m in standard segments, and that between suspender and main tower is 13.5 m. The main towers both are portal reinforced concrete bridge towers made of C40 concrete. The tower on the north bank is 61.25 m high, and that on the south bank is 59.55 m. The elevation view of this bridge is shown in Figure 2.
[figure omitted; refer to PDF]
In the light of the loading scheme, the bridge was loaded. After the deformation of the bridge was stable, the displacement or stress of each measuring point and the internal force of the suspenders were measured, and the changes of the bridge were observed. By comprehensively analysing the test data and the bridge changes, the working performance of the bridge and the mechanical behaviour of the main girder could be revealed. At the same time, the deficiencies of the double-sided steel box girder such as large torsional deformation and shear lag effect could be found to provide reference for the construction of similar girder in the future. The full-scale field test could also provide the most direct reference for the finite element simulation analysis of the bridge. To be specific, the accuracy of the finite element model could be judged by comparing the field test data with the calculation results of the finite element model [20]. In the process of the field static load test, in order to prevent accidents due to insufficient bearing capacity of the bridge, the bridge was loaded step by step to the maximum load and the load step was set at 300 kN.
2.3.2. Layout Scheme of Measuring Points
The main test terms were the deflection distribution of the bridge, the internal forces of suspenders, and the stress of key sections of main beam under different loading conditions. For obtaining the longitudinal distribution of bridge deflection, 39 measuring points were set up in the upstream and downstream of the bridge, respectively. In the transversal direction, these measuring points of each side are on the inside of the suspender, which were away from the suspenders 20 cm. And in the direction of the longitudinal bridge, they were distributed on the longitudinal bridge at each suspender, anchoring point, bridge tower, and the middle and end of the first span of the approached bridge. The specific layout locations of these measuring points are shown in Figure 5(a). And 10 measuring points were arranged in the midspan l/2 section (Section 1-1) to get the transverse deflection distribution, as shown in Figure 5(b). The Leica Level (NA02) was used to measure the elevation of each measuring point, and the deflection value could be obtained by subtracting the elevation values before and after loading. And the elevation datum point of this bridge was taken as the reference point with zero displacement.
[figures omitted; refer to PDF]
Except for the deflection of the main girder, the internal force increment of the suspenders was also an important factor to judge the overall mechanical behaviour of suspension bridge. In this test, a total of 10 suspender force measuring points were set up, which were located on ten suspenders in the middle of the upstream and downstream, that was, U14-18 and D14-18 suspenders, in which U and D represented the upstream and downstream, respectively, and the number indicated the serial number of suspenders. The cable force tester was used to measure the internal force increments of the 10 middle suspenders under different working conditions according to the principle of the chord vibration method.
Because the mechanical behaviour of the ultra-wide double-sided steel box girder was complex and there was little research at present, this study specially studied the mechanical behaviour of this kind of girder and focused on its shear lag effect. To accurately measure the stress distribution of the main girder and research the influence of suspender and crossbeam on the force of the main girder, three cross sections of the girder near the middle of the midspan were selected, and 29 stress measuring points were arranged on the bottom side of top plates of each selected section. The three selected sections were the midspan l/2 section (Section 1-1), section 3.3 m away from Section 1-1 (Section 2-2), and section 5 m away from Section 1-1 (Section 3-3). Both Sections 2-2 and 3-3 were located on the side near Yizhou Road. There are suspenders and crossbeam at Section 1-1, no suspenders but crossbeam at Section 2-2, and neither suspenders nor crossbeam at Section 3-3. The schematic diagram of selected section and the arrangement of stress measuring points are shown in Figure 6.
[figures omitted; refer to PDF]
2.3.3. Loading Conditions
According to the “Highway Bridge Load Test Regulations” JTG/T J21-01-2015, when the load test is carried out on the completed bridge, the load efficiency should be between 0.85 and 1.05 [21]. Combined with the structural characteristics of the bridge and the model calculation results, 16 triaxial trucks with a mass of about 30 t were used as loading vehicles. The front, middle, and rear axle masses of the loaded vehicle are 6 t, 12 t, and 12 t, respectively. And the loaded wheel spacing is shown in Figure 7.
[figure omitted; refer to PDF]
In the test, three loading conditions were set, namely, symmetrical loading of midspan l/2 section (Condition 1), eccentric loading of midspan l/2 section (Condition 2), and symmetrical loading of midspan l/4 cross section (Condition 3). The layout of loading vehicles under each condition is shown in Figure 8. After the loading vehicle was loaded in place in accordance with the sequence, the engine should be shut down and the test data should be collected after the bridge deformation was stable.
[figures omitted; refer to PDF]
3. Experimental Results and Analysis
3.1. Bridge Integral Deformation
So as to understand the overall working performance of the bridge, the longitudinal and transverse distribution of bridge deflection were analysed. First of all, the longitudinal distribution of bridge deflection was studied. Under the condition of symmetrical loading, the deflections at the same position of the upstream and downstream of the bridge were almost the same, so the average deflection of the upstream and downstream of the bridge in the same position was taken as the deflection value of this position. Under the condition of eccentric loading, the deflections of the upstream and downstream of the bridge were quite different, so the deflection values of the upstream and downstream were given, respectively. Then, the transverse distribution of the bridge deflection was analysed. Based on the longitudinal and transverse distribution of bridge deflection, the overall deformation performance of the bridge was judged.
Figure 9 shows the longitudinal distribution of the test values of the deflection of the bridge under three loading conditions. It can be seen from the figure that the measured maximum deflection of the main beam under the three loading conditions is 110.876 mm, 88.87 mm, and 77.63 mm, respectively. The maximum deformation of the bridge is less than the allowable value 820 mm [22], indicating that the bridge capacity meets the requirements. Under the action of the load on l/2 section (Conditions 1 and 2), the vertical deflection of the main beam changes in a V shape from the section of the G15 suspender in the middle of the span to both ends of the bridge, and the trend to both ends is the same. However, under the action of the load on l/4 section (Condition 3), the loading place is bent downward, while the l/4 cross section at the other end of the bridge is arched upward, and the overall deformation of the bridge is S-shaped. From the longitudinal distribution shape of the deflection, it can be known that the overall symmetry of the bridge is good, and the main girder of the bridge has a good overall longitudinal stiffness. When the bridge is subjected to the eccentric load on the l/2 section, the deflection of the loaded side (downstream) is much larger than that of the unloaded side (upstream). The maximum measured values of upstream and downstream deflections are 32.35 mm and 77.63 mm, respectively, and the main girder of the middle span has obvious torsional deformation. This phenomenon indicates that eccentric loading is detrimental to the torsion of ultra-wide double-sided steel box girders, which should be avoided as much as possible in practice.
[figure omitted; refer to PDF]
Figure 10 shows the experimental values of lateral distribution of deflection of l/2 cross section under the symmetrical loading and eccentric loading on l/2 section (Conditions 1 and 2). In the case of symmetrical loading, the transverse distribution curve of deflection is close to a horizontal straight line, but the deflection in the middle is slightly greater than the deflection on the sides. This is caused by the box girder on both sides. The middle part of the top plate is far away from the box girder, and so its stiffness is smaller and its deflection is larger. If the deflection of the top plate middle part is too large, the cross slope of the bridge deck would be offset, which may cause stagnant water on the bridge deck, accelerate the corrosion of the steel girder, and affect the driving safety. The deformation in the middle of the top plate of the ultra-wide double-sided steel box beam has a greater impact on the structure. In the case of eccentric loading, except for the deflection of two box girders, the transverse distribution curve of deflection is close to an oblique line. In the case of eccentric loading (Condition 2), except for the deflection of two box girders, the transverse distribution curve of deflection is close to an oblique line. This indicates that the overall stiffness of the top plate is good, and the deformation could be consistent. However, the stiffness of the box girder on both sides is greater than that of the top plate, and the deflection of the steel beam has a sudden decreasing trend relative to the deflection of top plate. This leads to a large difference in deflection between the left and right sides of the top plate close to the steel beam, and the deformation of this segment of the top plate would be greater than that of other parts.
[figure omitted; refer to PDF]
The transverse distribution of the shear lag coefficient of three selected sections is seen under the action of Condition 1 from Figure 13. The distribution law of the shear lag coefficient of the three sections is roughly the same, the shear lag coefficient suddenly increases at the middle point of the top plate and the intersection of the top plate and the web, and the shear lag coefficient is positive in these parts. This is due to the transverse slope of the bridge deck and the abrupt change of the cross section caused by the box girders on both sides. In addition, the existence of suspenders and crossbeam would have a certain influence on the distribution of shear lag coefficient of ultra-wide double-sided steel box girder. On the control section without suspender and crossbeam (Section 3-3), the shear lag coefficient is positive, while there is an alternation of positive and negative shear lag on the control section without suspender but with crossbeam (Section 2-2) and on the control section with suspender and crossbeam (Section 1-1). The shear lag coefficient reaches its peak at the junction of box girder and top plate on both sides and shows positive shear lag in this range. However, the shear lag coefficient of Section 1-1 is less than that of Section 2-2 as a whole. It is obvious that the suspenders and crossbeam changed the stress of the girder, thus changing the shear lag effect of the cross section. By comparing the changes of the shear lag coefficient of different sections, it can be known that when the crossbeam or suspenders are added on the cross section, the peak value of the transverse shear lag coefficient would decrease significantly, and the negative shear lag phenomenon would also occur in the cross section. However, the overall change law of the shear lag coefficient would not change obviously.
Due to the existence of shear lag effect, the concept and calculation method of the effective flange width of box girder are given in AASHTO code [26]. The width-span ratio of the Yunlongwan Bridge is b/l = 48500/205000 ≈ 0.2366. According to section 4.6.2.6.2 in AASHTO, the effective width ratio is about 0.665, which is equivalent to the shear lag coefficient of 1/0.665 = 1.504. In this test, the average shear lag coefficient of Section 3-3 at the webs of two side girders is 1.65138. This indicates that the shear lag coefficient calculated by AASHTO is slightly smaller than the test. Therefore, the effective flange width should be appropriately reduced in the stress calculation of the ultra-wide double-sided steel box girder.
4. Establishment of Multiscale Model and Parametric Analysis
Figure 14 shows the cracking of the bridge deck pavement just after the Yunlongwan Bridge opened to traffic. It can be seen that serious cracks occurred in the carriageway, resulting in the forced rework of this bridge. It is preliminarily speculated that the overloading was serious, and the excessive longitudinal and transverse tensile stress of the bridge deck led to the cracking of the asphalt pavement. In general, there are many factors which could bring about the excessive stress of the bridge deck, and in addition to the increasingly serious overloading problem, the U-rib thickness and diaphragm spacing among the design factors would also have some influence. In response to this problem, the multiscale finite element model of the Yunlongwan Bridge was established by ANSYS finite element software, based on which the influence of various parameters on the maximum stress of bridge section under Condition 3 was studied.
[figure omitted; refer to PDF]
After the establishment of the model, the deflection of the bridge and the stress distribution of Section 1-1 under the action of Condition 1 were calculated by the model and the static elastic type was adopted. The comparison between the calculated result and the experimental result is shown in Figure 17. It can be seen that the calculated values in the figure are very close to the experimental values. It is shown that the established model has a good accuracy and could accurately simulate the force of the bridge. Therefore, the finite model could be used for force calculation and parameter analysis of the bridge.
[figures omitted; refer to PDF]
According to the simulation results, this paper selects the top plate section at the target section and the adjacent crossbeam sections on the left and right sides (the left section is between the third row and the fourth row, and the right section is between the front and rear wheels of the third row). By changing the parameters in the ANSYS model, the influence of U-rib thickness, beam spacing, and vehicle axle load on the maximum stress of the top plate of the target section was studied, which could provide some guidance for bridge design and operation.
4.2. Change of U-Rib Thickness
The change of U-rib thickness would affect the longitudinal stiffness of the bridge deck. When the stiffness of the beam is large and the beam has small deformation, the bending stress or deformation caused by the axial force can be ignored, and the total stress can be calculated according to the superposition principle. The bending normal stress in the beam would decrease with the increase of stiffness; hence, it can be seen that the U-rib stiffness could affect the longitudinal normal stress of the top plate.
The change of the maximum top plate stress in X direction of each section with the increase of the thickness of U-rib was extracted from the model as shown in Figure 18. It can be seen from the figure that the maximum tensile and compressive stresses of the top plate at the three sections all decrease to a certain extent with the increase of the thickness of U-ribs. And the maximum stress decreases rapidly when the U-rib thickness increase from 2 mm to 4 mm. Specifically, the maximum tensile and compressive stresses at the top plate of the target section decrease most significantly, and the former decreases from 18.7 MPa to 8.3 MPa, decreasing by 55.6%, while the latter decreases from 31.1 MPa to 22.3 MPa, decreasing by 28.3%. The stress curves tend to be flat after the U-rib thickness reaches 4 mm and basically stable after 8 mm. This phenomenon shows that the increase of U-rib thickness can effectively reduce the maximum stress of the top plate at the section where the wheel acts. However, the beam weight would increase with the U-rib thickness. When the thickness of the U-rib is too thick, increasing it continuously has no significant effect on improving the stress state of the beam.
[figure omitted; refer to PDF]
In Figure 18, X denotes the X direction; L, U, and R denote the left, target, and right sections, respectively; and T and C denote the tensile and compressive stress, respectively.
There are not only X-direction cracks but also Z-direction cracks in bridge deck pavement. According to the model, the Z-direction stress is mainly tensile, and the compressive stress is very small, so only the variation of the maximum tensile stress with U-rib thickness was extracted from the model as shown in Figure 19. It can be seen from the figure that the maximum top plate tensile stress at target section is relatively large, exceeding 22 MPa, and the effect of changing the thickness of the U-rib on the tensile stress is more obvious. When the thickness of the U-rib increases from 2 mm to 6 mm, the stress decreases significantly, from 24.7 MPa to 22.4 MPa, a decrease of 9.3%. However, compared with the cross section of the adjacent beam, the stress is still very large. After 6 mm, the effect of the increase of U-rib thickness on the maximum stress is not obvious. Therefore, it is suggested that the thickness of U-rib should be controlled at about 6 mm in the design, which can effectively prevent the top plate from cracking. In addition, due to the local extrusion between vehicles, the tensile stress appears at the top of the left crossbeam, and the maximum value is about 12 MPa. When the thickness of the U-rib is less than 5 mm, the maximum tensile stress at that section decreases with the increase of the thickness of the U-rib, and when the thickness is greater than that of 5 mm, the maximum tensile stress at the section increases with the increase of the thickness. At the top plate of the right beam, the tensile stress in Z direction is very small, and the maximum value is only about 2∼3 MPa, and the maximum tensile stress increases gradually with the increase of U-rib thickness, but the change is not obvious.
[figure omitted; refer to PDF]4.3. Change of Diaphragm Spacing
The longitudinal stress of the top plate can be improved by changing the thickness of U-ribs to increase the longitudinal stiffness. Similarly, it can be achieved by increasing the stiffness of the transverse bridge to reduce the Z-direction stress of the top plate. Diaphragm is a member set up between beams to maintain the shape of the section and enhance the transverse stiffness, which mainly plays the role of distributed load. Study shows that reducing the diaphragm spacing is an effective method to increase the transverse stiffness of the bridge.
The calculation results of the model show that except for the stress at the target section in the X direction is mainly compressed, the stresses in other cases are mainly in tension, and this paper only studies the main stress types. Table 4 shows the changes of the maximum stresses in the X and Z directions of the top plate at three sections with the change of diaphragm spacing. It can be seen from Table 4 that when the distance between diaphragms is 9.9 m, the maximum stresses in X and Z directions of each section are large. With the decrease of diaphragm spacing from 9.9 m to 3.3 m, the maximum stresses in X and Z directions of each section decrease obviously. This means that the reduction of the diaphragm spacing increases the longitudinal and transverse stiffness, which would lead to a significant reduction of stress in the X and Z directions. The maximum stresses in the X and Z directions of the top plate at the target section are obviously larger than those at the left and right sections, and the reduction of the distance between beams has the greatest influence on the maximum stress of the top plate at this section. With the decrease of diaphragm spacing from 9.9 m to 3.3 m, the maximum stress in the X direction decreases from 41.5 MPa to 23.5 MPa, reducing by 43.4%. In the Z direction, the maximum stress changed from 38.1 MPa to 22.3 MPa, a decrease of 41.5%. However, no matter how the diaphragm spacing changes, the stresses in the X and Z directions at the wheel section are still the largest. It also can be seen that a change in crossbeam space from 6.6 m to 3.3 m causes a smaller stress to drop than a change in crossbeam space from 9.9 m to 6.6 m. This is because that when the crossbeam space decreases, the self-weight of beam would increase, which could increase the stress on the beam.
Table 4
Influence of changing diaphragm spacing on the maximum stress of top plate.
Space of crossbeam (m) | X-direction stress (MPa) | Z-direction stress (MPa) | ||||
L | U | R | L | U | R | |
9.9 | 17.3 | −41.5 | 14.5 | 20.8 | 38.1 | 18.2 |
6.6 | 7.8 | −36.5 | 7.7 | 12.2 | 35.4 | 11.3 |
3.3 | 5.2 | −23.5 | −1.4 | 12.4 | 22.3 | 3.1 |
Decrease | 69.9% | 43.4% | 109.7% | 40.4% | 41.5% | 83.0% |
4.4. Change of Axle Load of Vehicle
The damage of automobile axle load to highway pavement conforms to the “Four-Time Method”; that is, if the axle load is doubled, the degree of road damage would increase by 16 times. The empty weight of the loaded vehicle used in this loading test is 20 t, and the nuclear load weight is 10 t. The change of the top plate stress of three sections during the loading vehicle from empty to overloading was studied by changing the axle load in the model. And in the model calculation, the analysis type was static analysis. Under the vehicle load, the X-direction top plate at the target section and the right crossbeam section is mainly under compression, while in other cases, the top plate is mainly under tension, and only the main stress types are extracted as shown in Figure 20. It can be seen that the maximum tensile and compressive stresses increase linearly with the increase of vehicle load. Among them, the maximum stresses in the X and Z directions of the target section are larger than those of the other two sections, and the change of them with the axle load is the most significant. During the change process of axle load from 20 t to 60 t, the maximum tensile stress in the Z direction increases by 194.6% from 14.9 MPa to 43.9 MPa, and the maximum compressive stress in the X direction increases by 207.5% from 15.9 MPa to 48.9 MPa. In addition, there is a certain change in the Z-direction stress at the top plate of the left crossbeam, from 6.8 MPa to 19.2 MPa, an increase of 182.4%, while in other cases, the maximum stress of the top plate is basically unchanged. According to the position of pavement cracks and the calculation result, it can be seen that the pavement cracks were mainly caused by the load of heavy vehicles and had little relation with the shear lag effect because the tensile stress on the top plate at the direct action of the wheel would exceed the tensile limit of the pavement. Therefore, the vehicle load should be restricted, and the quality of pavement should be improved.
[figure omitted; refer to PDF]5. Conclusions
In this study, the mechanical performance of a self-anchored suspension bridge with ultra-wide double-sided steel box girder was studied based on the field test, and a parametric study was conducted to investigate the influences of various parameters on the mechanical performance of the girder. Based on the present study, the following conclusions are drawn:
(1) The test results show that the deformation and stress of the Yunlongwan Bridge under vehicle load meet the requirements. The bridge has a good integrity, and the bridge deformation is symmetrical under symmetrical load. While under the eccentric load, the main girder would obviously twist, and the internal force of suspenders on both sides of the bridge are uneven. The top plate would have alternating stress which may cause a risk of fatigue damage.
(2) There is an obvious shear lag effect in the ultra-wide double-sided box girder. Under the influence of shear lag effect, large stresses are generated at the junction of top plate and web. The shear lag coefficient suddenly increases at the middle point of the top plate and the intersection of the top plate and the web. The existence of suspenders and crossbeam would reduce the shear lag coefficient but would not change its variation law.
(3) The changes of U-rib thickness and diaphragm spacing would significantly affect the stiffness of double-sided steel box girder, thus changing the maximum longitudinal stress on the top plate of the main girder. When the U-rib thickness increases from 2 mm to 4 mm, the peak longitudinal stress reduces obviously and becomes stable when U-rib thickness exceeds 4 mm. In addition, the peak longitudinal stress decreases when the diaphragm spacing reduces from 9.9 m to 3.3 m.
(4) The maximum stress in the top plate of the girder increases linearly with the increase of vehicle axle load. When the vehicle axle load increases from 20 t to 60 t, the maximum tensile and compressive stresses in the top plate at the wheel position change most significantly, increasing to 194.6% and 207.5%, respectively. It indicates that overloading has a greater hazard to the bridge deck and vehicle overloading should be strictly prohibited.
Acknowledgments
This research was funded by projects of National Natural Science Foundation of China (51408040), Natural Science Foundation of Shaanxi Provincial Department of Education (2017JM5110), Science and Technology Plan Project of Shaanxi Provincial Department of Communications (17-15K), and Natural Science Research of Anhui University (KJ2019A1134).
[1] X. Wang, H. Wang, Y. Sun, X. Mao, S. Tang, "Process-independent construction stage analysis of self-anchored suspension bridges," Automation in Construction, vol. 117,DOI: 10.1016/j.autcon.2020.103227, 2020.
[2] Y. Liu, C. Yang, Z. Tan, "Hybrid element-based virtual distortion method for finite element model updating of bridges with wide-box girders," Engineering Structures, vol. 143, pp. 558-570, DOI: 10.1016/j.engstruct.2017.04.030, 2017.
[3] Y.-H. Zhang, L.-X. Lin, "Shear lag analysis of thin-walled box girders based on a new generalized displacement," Engineering Structures, vol. 61, pp. 73-83, DOI: 10.1016/j.engstruct.2013.12.031, 2014.
[4] H. Li, S. Laima, J. Ou, "Investigation of vortex-induced vibration of a suspension bridge with two separated steel box girders based on field measurements," Engineering Structures, vol. 33 no. 6, pp. 1894-1907, DOI: 10.1016/j.engstruct.2011.02.017, 2011.
[5] Z. Y. Xia, A. Q. Li, J. H. Li, M. J. Duan, "FE model updating on an in-service self-anchored suspension bridge with extra-width using hybrid method," Applied Sciences, vol. 7 no. 2,DOI: 10.3390/app7020191, 2017.
[6] Z. Sun, D. M. Siringoringo, Y. Fujino, "Load-carrying capacity evaluation of girder bridge using moving vehicle," Engineering Structures, vol. 229,DOI: 10.1016/j.engstruct.2020.111645, 2021.
[7] H. S. Park, Y. S. Park, J. J. Lee, J. S. Kong, C. G. Lee, "Evaluation of load carrying capacity of a PC girder bridge using model updating techniques," Proceedings of the 2011 International Conference on Multimedia Technology, .
[8] C. Wu, Y. Yuan, X. Jiang, "Fatigue behavior assessment method of the orthotropic steel deck for a self-anchored suspension railway bridge," Procedia Engineering, vol. 161, pp. 91-96, DOI: 10.1016/j.proeng.2016.08.503, 2016.
[9] Z. Jin, S. Pei, X. Li, S. Qiang, "Probabilistic evaluation approach for nonlinear vehicle-bridge dynamic performances," Journal of Sound and Vibration, vol. 339, pp. 143-156, DOI: 10.1016/j.jsv.2014.11.008, 2015.
[10] J. He, Y. Liu, B. Pei, "Experimental study of the steel-concrete connection in hybrid cable-stayed bridges," Journal of Performance of Constructed Facilities, vol. 28 no. 3, pp. 559-570, DOI: 10.1061/(asce)cf.1943-5509.0000444, 2014.
[11] F. Madrazo-Aguirre, A. M. Ruiz-Teran, M. Ahmer Wadee, "Dynamic behaviour of steel-concrete composite under-deck cable-stayed bridges under the action of moving loads," Engineering Structures, vol. 103, pp. 260-274, DOI: 10.1016/j.engstruct.2015.09.014, 2015.
[12] H. C. Cheng, G. D. Shen, "Study on vehicle load and bridge response of Anqing bridge based on monitoring data," Modern Transportation Technology, vol. 14 no. 5, pp. 38-41, 2017. in Chinese
[13] Y. X. Ding, D. C. Zhang, Y. F. Zhang, Y. C. Xu, "Analysis of bridge displacement response and its correlativity under measured vehicle loads," World Bridges, vol. 46 no. 194, pp. 70-75, 2018. in Chinese
[14] J. Zhang, H. Peng, C. S. Cai, "Destructive testing of a decommissioned reinforced concrete bridge," Journal of Bridge Engineering, vol. 18 no. 6, pp. 564-569, DOI: 10.1061/(asce)be.1943-5592.0000408, 2013.
[15] K. Yokozeki, C. Miki, "Fatigue evaluation for longitudinal-to-transverse rib connection of orthotropic steel deck by using structural hot spot stress," Welding in the World, vol. 60 no. 1, pp. 83-92, DOI: 10.1007/s40194-015-0272-x, 2016.
[16] G. Zhou, A. Li, J. Li, "Test and numerical investigations on the spatial mechanics characteristics of extra-wide concrete self-anchored suspension bridge during construction," International Journal of Distributed Sensor Networks, vol. 15 no. 12,DOI: 10.1177/1550147719891561, 2019.
[17] G.-p. Zhou, A.-q. Li, J.-h. Li, M.-j. Duan, "Test and numerical investigations on static and dynamic characteristics of extra-wide concrete self-anchored suspension bridge under vehicle loads," Journal of Central South University, vol. 24 no. 10, pp. 2382-2395, DOI: 10.1007/s11771-017-3650-2, 2017.
[18] S. Y. Li, Y. Hong, H. Y. Gou, Q. H. Pu, "An improved method for analyzing shear-lag in thin-walled girders with rectangular ribs," Journal of Constructional Steel Research, vol. 177, 2020.
[19] J. C. Zang, Research on Force Analysis and Key Technologies of Heavy Load Traffic Pavement of Cement Concrete Bridge Traffic, 2014. in Chinese
[20] P. Lu, Z. Xu, Y. Chen, Y. Zhou, "Prediction method of bridge static load test results based on Kriging model," Engineering Structures, vol. 214,DOI: 10.1016/j.engstruct.2020.110641, 2020.
[21] MOT JTG/T J21-01-2015, Load Test Method for Highway Bridge, 2016. in Chinese
[22] JTG D64-2015, Specifications for Design of Highway Steel Bridge, 2015. in Chinese
[23] X.-W. Sheng, W.-Q. Zheng, Z.-H. Zhu, Y.-P. Qin, J.-G. Guo, "Full-scale fatigue test of unit-plate ballastless track laid on long-span cable-stayed bridge," Construction and Building Materials, vol. 247,DOI: 10.1016/j.conbuildmat.2020.118601, 2020.
[24] Y. Chen, J. Dong, T. Xu, Y. Xiao, R. Jiang, X. Nie, "The shear-lag effect of composite box girder bridges with corrugated steel webs and trusses," Engineering Structures, vol. 181, pp. 617-628, DOI: 10.1016/j.engstruct.2018.12.048, 2019.
[25] L. Zhu, J. Nie, F. Li, W. Ji, "Simplified analysis method accounting for shear-lag effect of steel-concrete composite decks," Journal of Constructional Steel Research, vol. 115,DOI: 10.1016/j.jcsr.2015.08.020, 2015.
[26] AASHTO LRFD, AASHTO LRFD Bridge Design Specifications, 2017.
You have requested "on-the-fly" machine translation of selected content from our databases. This functionality is provided solely for your convenience and is in no way intended to replace human translation. Show full disclaimer
Neither ProQuest nor its licensors make any representations or warranties with respect to the translations. The translations are automatically generated "AS IS" and "AS AVAILABLE" and are not retained in our systems. PROQUEST AND ITS LICENSORS SPECIFICALLY DISCLAIM ANY AND ALL EXPRESS OR IMPLIED WARRANTIES, INCLUDING WITHOUT LIMITATION, ANY WARRANTIES FOR AVAILABILITY, ACCURACY, TIMELINESS, COMPLETENESS, NON-INFRINGMENT, MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE. Your use of the translations is subject to all use restrictions contained in your Electronic Products License Agreement and by using the translation functionality you agree to forgo any and all claims against ProQuest or its licensors for your use of the translation functionality and any output derived there from. Hide full disclaimer
Copyright © 2021 Fangwen Wu et al. This is an open access article distributed under the Creative Commons Attribution License (the “License”), which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited. Notwithstanding the ProQuest Terms and Conditions, you may use this content in accordance with the terms of the License. https://creativecommons.org/licenses/by/4.0/
Abstract
A sufficient understanding of mechanical performance of self-anchored suspension bridge with double-sided steel box girder is essential for design and normal use as such bridges are widely built in urban bridge. Using the Yunlongwan Bridge which is a suspension bridge with ultra-wide double-sided steel box girder as an example, this paper investigates its deformation and mechanical performance under vehicle load. Firstly, based on the field test results, the deformation performance of the bridge and the stress distribution of the main girder are analysed, with emphasis on the shear lag effect of double-sided steel box girder. Then, a multiscale model of the bridge was built, and the accuracy of the model was verified by comparison with the test data. Finally, the influence of design parameters on the mechanical behaviour of double-sided steel box girder is studied by numerical simulation. The results show that the deformation of the bridge has good symmetry, there is obvious shear lag effect on the main girder, and the U-rib thickness, diaphragm spacing, and vehicle load could significantly affect the stress of the main girder top plate. The obtained analytical results lead to a better understanding of the mechanical performance and provide reference for the design of self-anchored suspension bridge with double-sided steel box girder.
You have requested "on-the-fly" machine translation of selected content from our databases. This functionality is provided solely for your convenience and is in no way intended to replace human translation. Show full disclaimer
Neither ProQuest nor its licensors make any representations or warranties with respect to the translations. The translations are automatically generated "AS IS" and "AS AVAILABLE" and are not retained in our systems. PROQUEST AND ITS LICENSORS SPECIFICALLY DISCLAIM ANY AND ALL EXPRESS OR IMPLIED WARRANTIES, INCLUDING WITHOUT LIMITATION, ANY WARRANTIES FOR AVAILABILITY, ACCURACY, TIMELINESS, COMPLETENESS, NON-INFRINGMENT, MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE. Your use of the translations is subject to all use restrictions contained in your Electronic Products License Agreement and by using the translation functionality you agree to forgo any and all claims against ProQuest or its licensors for your use of the translation functionality and any output derived there from. Hide full disclaimer