Most people in the rural areas of Nepal rely on Micro-hydro Power Plants (MHPs) for their energy sources. With around four decade experiences in design and development of MHPs, Nepalese techno-entrepreneurs have gained wider reputation in the South Asian region and the beyond. However with the lack of competences in developing Francis turbines, majority of the MHPs are equipped with either Pelton of Cross Flow turbine, even though Francis units are suitable. With the devastating earthquake of a 7.6 magnitude that struck in the Gorkha district on Saturday, 25 April 2015, about 76 km northwest of the capital city Kathmandu, and the aftershocks followed claimed more than 8000 lives. It did not leave hydropower plants either. Many big plants have been affected and hundreds of MHPs were damaged, needing short to long term rehabilitation. The preliminary assessment of the 61 affected MHPs in the 6 earthquake affected districts shows more than 50% sites are suitable for Francis turbine. Hence the strategic rehabilitation plan has been developed in the present paper for the affected plants considering issues like geographical shift, dislocation of people and also with the focus on replacing the old turbine with Francis turbine in the suitable sites. The similar strategy can also be implemented in other developing countries with such situations.
You have requested "on-the-fly" machine translation of selected content from our databases. This functionality is provided solely for your convenience and is in no way intended to replace human translation. Show full disclaimer
Neither ProQuest nor its licensors make any representations or warranties with respect to the translations. The translations are automatically generated "AS IS" and "AS AVAILABLE" and are not retained in our systems. PROQUEST AND ITS LICENSORS SPECIFICALLY DISCLAIM ANY AND ALL EXPRESS OR IMPLIED WARRANTIES, INCLUDING WITHOUT LIMITATION, ANY WARRANTIES FOR AVAILABILITY, ACCURACY, TIMELINESS, COMPLETENESS, NON-INFRINGMENT, MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE. Your use of the translations is subject to all use restrictions contained in your Electronic Products License Agreement and by using the translation functionality you agree to forgo any and all claims against ProQuest or its licensors for your use of the translation functionality and any output derived there from. Hide full disclaimer
Details
1 Turbine Testing Lab, Department of Mechanical Engineering, Kathmandu University, Dhulikhel, Nepal