It appears you don't have support to open PDFs in this web browser. To view this file, Open with your PDF reader
Abstract
Traditionally, hydro power plants have been operated close to the best efficiency point, the more stable operating condition for which they have been designed. However, because of changes in the electricity market, many hydro power plant operators wish to operate or already operate their machines differently to fulfil new market needs. New operating conditions can include the whole 0 to 100% range of operation, numerous start/stops, extensive low load operation, synchronous condenser mode and power/frequency regulation. In order to design reliable 0-100% Francis™ runners for these new challenging operating scenarios, Andritz Hydro has developed various proprietary tools and design rules. These are used within Andritz Hydro to design mechanically robust Francis runners for the operating scenarios fulfilling customer’s specifications. Hydraulic development and mechanical verifications are done conjointly to converge toward an optimal solution. Francis runner dynamic stresses on the complete operating range from 0-100% load can be predicted and compare well with prototype strain measurements. In addition to operation under a wider operating range, the number of start-ups has also a significant impact on Francis runner fatigue life. In our paper, we will present details of the design considerations required for operating Francis turbines from 0 to 100% power.
You have requested "on-the-fly" machine translation of selected content from our databases. This functionality is provided solely for your convenience and is in no way intended to replace human translation. Show full disclaimer
Neither ProQuest nor its licensors make any representations or warranties with respect to the translations. The translations are automatically generated "AS IS" and "AS AVAILABLE" and are not retained in our systems. PROQUEST AND ITS LICENSORS SPECIFICALLY DISCLAIM ANY AND ALL EXPRESS OR IMPLIED WARRANTIES, INCLUDING WITHOUT LIMITATION, ANY WARRANTIES FOR AVAILABILITY, ACCURACY, TIMELINESS, COMPLETENESS, NON-INFRINGMENT, MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE. Your use of the translations is subject to all use restrictions contained in your Electronic Products License Agreement and by using the translation functionality you agree to forgo any and all claims against ProQuest or its licensors for your use of the translation functionality and any output derived there from. Hide full disclaimer
Details
1 Andritz Hydro Canada Inc., 6100 aut. Transcanadienne, Pointe-Claire, H9R 1B9
2 Andritz Hydro GmbH, Escher-Wyss-Weg 1, 88212 Ravensburg, Germany
3 Andritz Hydro SA, Rue des deux gares 6, 1800 Vevey, Switzerland