It appears you don't have support to open PDFs in this web browser. To view this file, Open with your PDF reader
Abstract
Recently, it is real to recognize the importance of airtightness performance and it has become mandatory to measure airtightness performance measurement through various standards in Korea. In Korea, air tightness performance is measured using blower door test based on pressurization / depressurization method. However, the conventional blower door test has various inconveniences and problems in the measurement. This study propose a method of predicting the airtightness performance by using the pressure difference, which can replace the conventional blower door test method that can measure the airtightness performance. In order to verify the method proposed in this study, the predicted results were compared to the measured results using blower door test. The proposed method is similar to the blower door test when compared to the blower door test, but there are some differences. The blower door test is measured by measuring the air flow at several pressure difference conditions (10 ∼ 70 Pa) and finding C, n. C and n values can be calculated and the airtightness performance can be obtained by knowing the amount of air passing through the building envelope. However, the only way to measure the airflow through the actual building envelope is the blower door test, which is difficult to measure with other methods. This study measured the pressure difference between the front door and the building envelope, which can be easily measured, and calculated the airflow that pass to the building envelope based on the airflow at various pressure difference conditions shown in the airtightness report of the front door. This is possible because the amount of air flowing in and out under steady state conditions is always the same. Based on this, the airflow was calculated at several pressure difference conditions of the building envelope, and C and n were defined. With this, it is possible to calculate the airtightness performance, the leakage area under various pressure difference conditions. In order to verify the proposed method, this study measures the pressure difference and the airtightness performance of the building using the existing method. The results are as follows; the value of C, n was calculated using the proposed method, and C was about 19.4 and n was about 0.895. The airtightness performance was predicted based on the calculated C and n, and the airtightness performance was calculated to be 3.25 (1/h@50 Pa). When the error rate is calculated as NMSE(Normalized Mean Square Error) for the airtightness performance measured by the blower door test and predicted in this study, NMSE is calculated as 0.01, and the method proposed in this study is reliable because it is included in the reliable range of NMSE 0.25. Proposed method is possible to calculate all the values obtained from the existing blower door test. Therefore, the method can replace the blower door test because both C and n values, airtightness performance, and leakage area under various pressure difference conditions can be calculated.
You have requested "on-the-fly" machine translation of selected content from our databases. This functionality is provided solely for your convenience and is in no way intended to replace human translation. Show full disclaimer
Neither ProQuest nor its licensors make any representations or warranties with respect to the translations. The translations are automatically generated "AS IS" and "AS AVAILABLE" and are not retained in our systems. PROQUEST AND ITS LICENSORS SPECIFICALLY DISCLAIM ANY AND ALL EXPRESS OR IMPLIED WARRANTIES, INCLUDING WITHOUT LIMITATION, ANY WARRANTIES FOR AVAILABILITY, ACCURACY, TIMELINESS, COMPLETENESS, NON-INFRINGMENT, MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE. Your use of the translations is subject to all use restrictions contained in your Electronic Products License Agreement and by using the translation functionality you agree to forgo any and all claims against ProQuest or its licensors for your use of the translation functionality and any output derived there from. Hide full disclaimer
Details
1 Department of Civil, Architectural and Environmental Systems Eng., Graduate School, Sungkyunkwan University, 2066 Seobu-ro, Jangan-gu, Suwon-si, Gyeonggi-do, 16419, Korea
2 Division of Architecture and Urban Design, Incheon National University, 119 Academy-ro, Yeonsu-gu, Incheon, Korea
3 Hyundai Engineering and Construction, Mabuk-ro 240beon-gil, 16891, Korea