It appears you don't have support to open PDFs in this web browser. To view this file, Open with your PDF reader
Abstract
In the batch production, the use of a single machine for several stages of the processes will result in waiting time of production batch to be long. It will cause an increase in work in process (WIP) inventory cost. CNC-machining centre is a type of CNC machine that can carries out several stages of processes singly. In some cases, this machine is often single used to make a product through several stages of processes, from raw material to end product. One of the reasons to use a single machine is to avoid transfer from one stage (machine) to next machine. However, single use causes inventory to accumulate due to long waiting times. The objective of this research is to reduce the WIP inventory cost at the CNC-machining centre. Scheduling to minimize WIP inventory cost is done through two steps. First step, divide number of stages of processes to be assigned to m serial CNC-machining centers. Second step, determine transfer batch size is smaller than the production batch size to be transferred to the next stages. The results of this research indicate that there is a reduction in WIP inventory cost by 53.47 percent. Scheduling multi-stage batch production on m machines with small transfer batch size will reduce WIP inventory cost.
You have requested "on-the-fly" machine translation of selected content from our databases. This functionality is provided solely for your convenience and is in no way intended to replace human translation. Show full disclaimer
Neither ProQuest nor its licensors make any representations or warranties with respect to the translations. The translations are automatically generated "AS IS" and "AS AVAILABLE" and are not retained in our systems. PROQUEST AND ITS LICENSORS SPECIFICALLY DISCLAIM ANY AND ALL EXPRESS OR IMPLIED WARRANTIES, INCLUDING WITHOUT LIMITATION, ANY WARRANTIES FOR AVAILABILITY, ACCURACY, TIMELINESS, COMPLETENESS, NON-INFRINGMENT, MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE. Your use of the translations is subject to all use restrictions contained in your Electronic Products License Agreement and by using the translation functionality you agree to forgo any and all claims against ProQuest or its licensors for your use of the translation functionality and any output derived there from. Hide full disclaimer
Details
1 Departement of Industrial Engineering, Faculty of Engineering, Universitas Islam Bandung, Bandung 40116, Indonesia