Abstract

The paper describes a cutoff valve developed by the authors for thermal-mining method of oil production. The location of the cutoff valve components in the initial position and at the maximum opening of the hydrodynamic link between a borehole cavity and a gathering main are schematically shown. The procedure of installing the cutoff valve in the well bore is given. The cutoff valve is used to equip the wells of high-viscosity oil fields developed via thermal treatment. The design of a cutoff valve for a horizontal well at Yaregskoe field was carried out. The given design proved that the device allows for online fine adjustment and tuning of operating practices (opening and closing pressure) without dismantling. The proposed design will make it possible to increase the quality and efficiency of operating wells at Yaregskoe field.

Details

Title
Development of a cutoff valve for thermal-mining oil production
Author
Verisokin, A E 1 ; Gunkina, T A 1 ; Mashkov, V A 1 

 North-Caucasus Federal University, 1 Pushkina ave., Stavropol, 355009, Russia 
Publication year
2018
Publication date
Nov 2018
Publisher
IOP Publishing
ISSN
17551307
e-ISSN
17551315
Source type
Scholarly Journal
Language of publication
English
ProQuest document ID
2574414638
Copyright
© 2018. This work is published under http://creativecommons.org/licenses/by/3.0/ (the “License”). Notwithstanding the ProQuest Terms and Conditions, you may use this content in accordance with the terms of the License.