Abstract

This paper proposes a method for determining location and calculating the minimum amount of power load needed to shed in order to recover the frequency back to the allowable range. Based on the consideration of the primary control of the turbine governor and the reserve power of the generators for secondary control, the minimum amount of load shedding was calculated in order to recover the frequency of the power system. Computation and analysis of the phase electrical distance between the outage generator and the loads to prioritize distribution of the amount power load shedding at load bus positions. The nearer the load bus from the outage generator is, the higher the amount of load shedding will shed and vice versa. With this technique, a large amount of load shedding could be avoided, hence, saved from economic losses, and customer service interruption. The case study simulation has been verified through using PowerWorld sofware systems. The effectiveness of the proposed method tested on the IEEE 37 bus 9 generators power system standard has demonstrated the effectiveness of this method.

Details

Title
Minimizing Load Shedding in Electricity Networks using the Primary, Secondary Control and the Phase Electrical Distance between Generator and Loads
Author
Le, Nghia T; Quyen, Anh Huy; Phan, Binh T T; Nguyen, An T; Pham, Hau H
Publication year
2019
Publication date
2019
Publisher
Science and Information (SAI) Organization Limited
ISSN
2158107X
e-ISSN
21565570
Source type
Scholarly Journal
Language of publication
English
ProQuest document ID
2656394391
Copyright
© 2019. This work is licensed under https://creativecommons.org/licenses/by/4.0/ (the “License”). Notwithstanding the ProQuest Terms and Conditions, you may use this content in accordance with the terms of the License.