Abstract

This paper presents an experimental investigation of the plugging efficiency of aggregate pouring through multiple boreholes under flowing water conditions into an inundated mine tunnel. Aggregate pouring into an inundated mine tunnel has been widely used and constitutes the premise for the salvage of flooded underground mines through further grouting. However, corresponding in-depth research is relatively limited due to the concealment of underground engineering. A visual experimental setup for aggregate pouring into a tunnel replica was built based on the theory of similarity between sediment movement and slurry pipeline transportation. Four factors, each with four levels, including the aggregate particle size (0.25–0.5, 0.5–1, 1–2 and 2–5 mm), distance between boreholes (0.5, 0.75, 1 and 1.5 m), initial water flow rate (0, 1.5 × 10−2 m/s, 2.4 × 10−2 m/s and 3 × 10−2 m/s) and tunnel inclination (0°, 3°, 5° and 8°) were selected in orthogonal experiments to investigate the plugging efficiency. Range and variance analysis of the four-level orthogonal array experimental results indicated that the factors influencing the plugging efficiency, varying between 83.96 and 98.15%, could be ranked in descending order as the initial water flow rate, aggregate particle size, distance between boreholes and tunnel inclination. The former two factors yielded a more significant influence than that of the latter two factors. The measured water pressure difference ranging from 16 to 32% between the front and back ends of the formed aggregate mass in the pouring process indicated that there remained a high resistance to water flow, even if the aggregate mass was not capped but reached a certain length. Plugging criteria for aggregate pouring into horizontal and inclined tunnels were then proposed. Moreover, the optimal distance between boreholes to form an effective bulkhead was determined, which could be defined as the distance between boreholes when the aggregate mass exhibits the fastest build-up and the plugging capacity is reached.

Details

Title
Plugging efficiency of pouring aggregates through multiple boreholes into an inundated tunnel to prevent groundwater inrush disasters
Author
Hui, Shuang 1 ; Sui, Wanghua 2   VIAFID ORCID Logo  ; Zhang, Gailing 2 ; Chen, Jiaxing 3 ; Yu, Shibo 4 

 China University of Mining and Technology, School of Resources and Geosciences, Institute of Mine Water Hazard Prevention and Control Technology, Xuzhou, China (GRID:grid.411510.0) (ISNI:0000 0000 9030 231X); China Design Group Co., Ltd., Nanjing, China (GRID:grid.495764.d) 
 China University of Mining and Technology, School of Resources and Geosciences, Institute of Mine Water Hazard Prevention and Control Technology, Xuzhou, China (GRID:grid.411510.0) (ISNI:0000 0000 9030 231X) 
 China University of Mining and Technology, School of Resources and Geosciences, Institute of Mine Water Hazard Prevention and Control Technology, Xuzhou, China (GRID:grid.411510.0) (ISNI:0000 0000 9030 231X); National Coal Mine Water Hazard Prevention Engineering Technology Research Center, Suzhou, China (GRID:grid.411510.0) 
 BGRIMMM Technology Group, Institute of Mining Engineering Research and Design, Beijing, China (GRID:grid.411510.0) 
Publication year
2022
Publication date
Dec 2022
Publisher
Springer Nature B.V.
e-ISSN
21978670
Source type
Scholarly Journal
Language of publication
English
ProQuest document ID
2685816705
Copyright
© The Author(s) 2022. This work is published under http://creativecommons.org/licenses/by/4.0/ (the “License”). Notwithstanding the ProQuest Terms and Conditions, you may use this content in accordance with the terms of the License.