© 2022 by the authors. Licensee MDPI, Basel, Switzerland. This article is an open access article distributed under the terms and conditions of the Creative Commons Attribution (CC BY) license (https://creativecommons.org/licenses/by/4.0/). Notwithstanding the ProQuest Terms and Conditions, you may use this content in accordance with the terms of the License.

Abstract

Current energy systems face multiple problems related to inflation in energy prices, reduction of fossil fuels, and greenhouse gas emissions which are disturbing the comfort zone of energy consumers and the affordability of power for large commercial customers. These kinds of problems can be alleviated with the help of optimal planning of demand response policies and with distributed generators in the distribution system. The objective of this article is to give a strategic proposition of an energy management system for a campus microgrid (µG) to minimize the operating costs and to increase the self-consuming energy of the green distributed generators (DGs). To this end, a real-time based campus is considered that currently takes provision of its loads from the utility grid only. According to the proposed given scenario, it will contain solar panels and a wind turbine as non-dispatchable DGs while a diesel generator is considered as a dispatchable DG. It also incorporates an energy storage system with optimal sizing of BESS to tackle the multiple disturbances that arise from solar radiation. The resultant problem of linear mathematics was simulated and plotted in MATLAB with mixed-integer linear programming. Simulation results show that the proposed given model of energy management (EMS) minimizes the grid electricity costs by 668.8 CC/day ($) which is 36.6% of savings for the campus microgrid. The economic prognosis for the campus to give an optimum result for the UET Taxila, Campus was also analyzed. The general effect of a medium-sized solar PV installation on carbon emissions and energy consumption costs was also determined. The substantial environmental and economic benefits compared to the present situation have prompted the campus owners to invest in the DGs and to install large-scale energy storage.

Details

Title
Scheduling and Sizing of Campus Microgrid Considering Demand Response and Economic Analysis
Author
Li, Bin 1 ; Shahzad, Muhammad 2 ; Haseeb Javed 2   VIAFID ORCID Logo  ; Hafiz Abdul Muqeet 3   VIAFID ORCID Logo  ; Akhter, Muhammad Naveed 4 ; Rehan Liaqat 5 ; Hussain, Muhammad Majid 6   VIAFID ORCID Logo 

 School of Electrical and Electronics Engineering, North China Electric Power University, Beijing 100096, China 
 Department of Electrical Engineering, Muhammad Nawaz Sharif University of Engineering and Technology, Multan 60000, Pakistan 
 Department of Electrical Engineering Technology, Punjab Tianjin University of Technology Lahore, Lahore 54770, Pakistan 
 Department of Electrical Engineering, University of Engineering and Technology (RCET), Lahore 54890, Pakistan 
 Department of Electrical Engineering, Government College University Faisalabad, Faisalabad 38000, Pakistan 
 Department of Electrical and Electronic Engineering, University of South Wales, Pontypirdd CF37 1DL, UK 
First page
6150
Publication year
2022
Publication date
2022
Publisher
MDPI AG
e-ISSN
14248220
Source type
Scholarly Journal
Language of publication
English
ProQuest document ID
2706460425
Copyright
© 2022 by the authors. Licensee MDPI, Basel, Switzerland. This article is an open access article distributed under the terms and conditions of the Creative Commons Attribution (CC BY) license (https://creativecommons.org/licenses/by/4.0/). Notwithstanding the ProQuest Terms and Conditions, you may use this content in accordance with the terms of the License.