Full Text

Turn on search term navigation

© 2022 by the authors. Licensee MDPI, Basel, Switzerland. This article is an open access article distributed under the terms and conditions of the Creative Commons Attribution (CC BY) license (https://creativecommons.org/licenses/by/4.0/). Notwithstanding the ProQuest Terms and Conditions, you may use this content in accordance with the terms of the License.

Abstract

Run-of-river hydropower plants are a cost-efficient technology that produce a power output proportional to the instantaneous flow of water diverted from the exploited stream by exploiting several mechanical, hydraulic, and electric devices. However, as no storage is available, its design and operation is tailored according to the unpredictability of its power generation. Hence, the modelling of this type of power plants is a necessity for the promotion of its development. Accordingly, based on models from the literature, this study proposes a comprehensive methodology for optimally designed small run-of-river hydropower plants based on a levelized cost of energy (LCOE). The proposed methodology aims at facilitating a faster design for more cost-effective and energy-efficient small hydropower plants. Depending on the average daily flow rates and the gross head of a given site, the model proposed in this study calculates the diameter, thickness, and length of a penstock; it also suggests the optimal selection of a turbine, determines the admissible suction head of a turbine for its optimal implementation, and determines the optimal number of turbines, all in order to minimize the LCOE of the proposed project. The model is tested to design a small run-of-river hydropower plant with a capacity of 6.32 MW exploiting the river Nyong in Mbalmayo. The results confirm the profitability of the investment with an LCOE of around 0.05 USD/kWh, which is the lowest limit value of the LCOE range for small hydropower plants, as presented in the IPCC (Intergovernmental Panel on Climate Change) report, assuming a project lifespan of 50 years and a discount rate of 12.5%. These results also show that it may be worth to provide the energy sector with a small hydropower design tool with a graphical interface. In addition, it would be appropriate to use a similar method in an off-grid context where a hydropower plant, with or without storage, is combined with another source to meet the electrical needs of a given population.

Details

Title
LCOE-Based Optimization for the Design of Small Run-of-River Hydropower Plants
Author
Amougou, Claude Boris 1 ; Tsuanyo, David 2   VIAFID ORCID Logo  ; Fioriti, Davide 3   VIAFID ORCID Logo  ; Kenfack, Joseph 4 ; Aziz, Abdoul 2 ; Abiama, Patrice Elé 2 

 National Centre for Development of Technologies, Ministry of Scientific Research and Innovation, Yaoundé P.O. Box 1457, Cameroon; Laboratory of Small Hydropower and Hybrids Systems, National Advanced School of Engineering, University of Yaoundé I, Yaoundé P.O. Box 8390, Cameroon 
 National Centre for Development of Technologies, Ministry of Scientific Research and Innovation, Yaoundé P.O. Box 1457, Cameroon 
 Department of Energy, Systems, Territory and Construction Engineering, University of Pisa, Largo Lucio Lazzarino 1, 56122 Pisa, Italy 
 Laboratory of Small Hydropower and Hybrids Systems, National Advanced School of Engineering, University of Yaoundé I, Yaoundé P.O. Box 8390, Cameroon 
First page
7507
Publication year
2022
Publication date
2022
Publisher
MDPI AG
e-ISSN
19961073
Source type
Scholarly Journal
Language of publication
English
ProQuest document ID
2728471060
Copyright
© 2022 by the authors. Licensee MDPI, Basel, Switzerland. This article is an open access article distributed under the terms and conditions of the Creative Commons Attribution (CC BY) license (https://creativecommons.org/licenses/by/4.0/). Notwithstanding the ProQuest Terms and Conditions, you may use this content in accordance with the terms of the License.