Full text

Turn on search term navigation

© 2023 by the authors. Licensee MDPI, Basel, Switzerland. This article is an open access article distributed under the terms and conditions of the Creative Commons Attribution (CC BY) license (https://creativecommons.org/licenses/by/4.0/). Notwithstanding the ProQuest Terms and Conditions, you may use this content in accordance with the terms of the License.

Abstract

Binary geothermal power plants (GPPs) are mostly encountered in geothermal fields with medium and low temperatures. The design and operation of dual binary GPPs can be difficult due to the geothermal fluid properties. This affects their performance and feasibility. Thermoeconomics are essential elements for the design and operation of the GPPs. In this study, advanced exergoeconomic analysis is applied to a true dual binary GPP (as a case study) to further evaluate it from performance and economic perspectives. In analysis, the specific exergy cost (SPECO) method is used. Then, some specific indicators are presented to evaluate the performance and economics of the GPP. Thus, technical and economic solutions have been developed in the design and operation stages through the analysis. The results of the study indicated that the total operating cost of 1218 USD/h could be reduced to 186 USD/h by improving the operating conditions. This corresponds to an 85% decrease. The cost per electricity generated, cost per geothermal energy input, and cost per CO2 emission of the GPP are determined as 0.049 USD/kWh, 5.3 USD/GJ, and 0.13 USD/kg, respectively. As a result, while the savings potential of the GPP is 15%, it can result in a 15% reduction in CO2 emission cost.

Details

Title
Advanced Exergoeconomic Assessment of CO2 Emissions, Geo-Fluid and Electricity in Dual Loop Geothermal Power Plant
Author
Güler, Onur Vahip 1   VIAFID ORCID Logo  ; Gürbüz, Emine Yağız 1   VIAFID ORCID Logo  ; Georgiev, Aleksandar G 2 ; Keçebaş, Ali 1   VIAFID ORCID Logo 

 Department of Energy Systems Engineering, Muğla Sıtkı Koçman University, 48000 Muğla, Turkey; [email protected] (O.V.G.); [email protected] (E.Y.G.); [email protected] (A.K.) 
 Department of General Engineering, University of Telecommunications and Posts, 1 Akad. Stefan Mladenov Str., 1700 Sofia, Bulgaria 
First page
3466
Publication year
2023
Publication date
2023
Publisher
MDPI AG
e-ISSN
19961073
Source type
Scholarly Journal
Language of publication
English
ProQuest document ID
2806519528
Copyright
© 2023 by the authors. Licensee MDPI, Basel, Switzerland. This article is an open access article distributed under the terms and conditions of the Creative Commons Attribution (CC BY) license (https://creativecommons.org/licenses/by/4.0/). Notwithstanding the ProQuest Terms and Conditions, you may use this content in accordance with the terms of the License.